Lesson 3 of 4 · Validation and useful service evidence
Validate products, services and outcomes
8 minute lesson · 3 checks along the way
Your goal for this lessonCalculate a bounded validation measure and distinguish product accuracy, timely delivery and public outcomes.
In this lesson 3 sections · 3 checks
Read & understand
Ask exactly what a validation number measures
The fictional basin team checks 100 locations its map marked as flooded against independent reference observations from matching times. Eighty are confirmed flooded and twenty are not. Among the flagged locations, 80 percent are confirmed. This is the precision of that positive class in this sample. It is not automatically the percentage of all flooded locations detected, because the check did not sample the places the map missed.
To examine missed floods, the team needs evidence about genuinely flooded locations outside the flagged set too. Keep the sampling design, reference dates and class definition with any reported percentage. A very high number can answer the wrong question if it describes a different population or a conveniently selected set of easy cases. These counts are invented for learning, not a measured AfriGEO result.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Separate accuracy from delivery
A second fictional test examines ten scheduled releases. Eight arrive before the users’ deadline; two arrive late. Timely delivery is therefore eight of ten, or 80 percent. Its numerical equality to the map’s sample precision is coincidental: one measure concerns deadlines and the other concerns classified locations. Neither can replace the other in a service report.
Imagine that the late releases were the two most urgent flood days. An average alone would obscure a serious practical limitation. Keep enough event-level detail to inspect when and where the service failed. The receiving team also needs a reliable way to identify revised products so that a correction does not remain trapped in a technical office while users act on an older map.
Different denominators answer different questions
Original classroom counts; equal percentages do not make the measures interchangeable.
Open full-size diagram in a new tab: Different denominators answer different questionsCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Evaluate the claimed public outcome separately
A claim that the service improved decisions needs evidence about use and outcomes, not just map downloads. In the classroom, officers might document when they received the product, whether it changed a decision and what happened afterward. Other influences, such as rainfall, staffing and road maintenance, also matter when interpreting changes over time. A product can be useful without claiming that it alone caused every beneficial result.
Choose measures with the users before the evaluation: a technical check of the map, a delivery check of the service and a suitable study of the decision or outcome. Report limits alongside successes. This distinction supports a regional collaboration’s learning because it identifies whether the next improvement belongs in observation processing, operations, training or the decision process.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.