Lesson 1 of 4 · Move from transfer orbit to service
Move from transfer orbit to service
6 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish launch insertion, orbital positioning and service commissioning in Alcomsat-1’s history.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A communications program with a ground responsibility
Alcomsat 1 is Algeria’s first telecommunications satellite, developed through cooperation with China. Unlike the Alsat imaging spacecraft, its principal role is to relay signals between ground systems. The program therefore includes more than the object in orbit: engineers must manage the spacecraft, control use of its radio payload and connect working terminals to useful services.
ASAL reported liftoff on 10 December 2017 at 17:40 in Algeria, corresponding to 11 December at 00:40 in Beijing. The agency’s later system page gives 00:41; that minute-level difference does not indicate a second launch. The December 10 and 11 calendar dates reflect time zones. Use a specified time standard when comparing mission records, and keep the source’s precision rather than inventing a reconciled second.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A transfer orbit is an intermediate destination
The launch report described insertion into a geostationary transfer orbit, or GTO. An elongated transfer orbit has a low point, called perigee, and a high point, called apogee. It is a route toward the desired operating orbit, not proof that the spacecraft already occupies a stable position over one longitude. Spacecraft maneuvers change the orbit after launch separation.
An ideal geostationary orbit is circular and equatorial, with motion matching Earth’s rotation. A ground antenna can then point toward a nearly fixed direction. Simply reaching a large altitude is insufficient: orbit shape, inclination and period matter. ASAL’s first-year account reports arrival at 24.8° west on 18 December 2017 after six maneuvers. That later account is evidence of the outcome; the launch-day report had forecast five maneuvers.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Positioning does not finish commissioning
After orbital placement, engineers still have to test spacecraft and communications functions. ASAL’s December 2018 retrospective records a first activated Ku-band transponder test in February, later broadcast trials and subsequent service agreements and interconnections. These are different milestones, with different evidence requirements. A healthy satellite and a useful end-user service are connected achievements, but they are not the same acceptance test.
Treat a mission timeline as a set of dated claims. A launch announcement can establish that a launcher released the spacecraft into a transfer orbit. A later orbit report can establish achieved positioning. An end-to-end trial can demonstrate a specified connection under tested conditions. Do not silently convert a predicted maneuver count, planned test period or advertised application into an observed result.
Three gates from launch to useful service
Original teaching diagram. Conceptual sequence; not orbit geometry or the complete flight timeline.
Open full-size diagram in a new tab: Three gates from launch to useful serviceCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.