Lesson 2 of 3 · Follow the recorder through a contact
Follow the recorder through a contact
20 minute lesson · 3 checks along the way
Your goal for this lessonIntegrate concurrent acquisition and intermittent downlink, find peak storage and test the effect of a delayed contact.
In this lesson 6 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Simultaneous does not mean unlimited
PhilSA's 2024 report describes simultaneous image capture and downlink within a pass as a planned MULA capability. This connects the instrument to a time-dependent data system: new bytes can enter a recorder while earlier bytes leave it. The report's planned capability is not evidence that a particular contact has already delivered a given amount of useful imagery. It also does not provide the recorder sizes or rates used here.
We will test a fictional recorder with continuous data flow. This deliberately simplified model lets acquisition and radio service operate independently, ignores packet overhead and retransmissions, and permits transmission before an entire file is complete. A system with shared resources or whole-file waiting would need different rules. The lesson is to declare such rules before using a rate calculation to promise that storage will never overflow. All times are seconds and all data quantities are decimal MB.
Read & understand
Define arrivals, usable service and capacity
At time zero, the recorder contains 20 MB. Imaging adds data at 4 MB/s from time 0 to time 30, then stops. The capacity is 90 MB. Downlink can remove data at 6 MB/s during two contacts: time 10 to 20, and time 30 to 45. Outside those intervals the service rate is zero. A contact's stated rate is usable data service in this model, not a radio symbol rate requiring another conversion.
While the recorder holds data, its rate of change equals arrival rate minus service rate. With imaging alone it grows by 4 MB each second; with imaging and downlink together it shrinks by 2 MB each second. Downlink alone removes 6 MB each second. At zero, unused service must be discarded: the recorder cannot become negative. First calculate the storage the schedule would require without an upper capacity clip, then compare its largest value with 90 MB.
Read & understand
Trace every change in rate
Trace each event where a rate changes. During the first ten seconds, 40 MB arrives, taking occupancy from 20 to 60 MB. From time 10 to 20, downlink exceeds acquisition by 2 MB/s, so occupancy falls by 20 MB to 40 MB. Imaging continues without a contact for the next ten seconds, adding another 40 MB. At time 30 the recorder reaches 80 MB, its largest value in the nominal schedule.
After time 30 no more imagery arrives, and the second contact drains the recorder. The 80 MB takes 80 / 6 = 13⅓ seconds to send, so the recorder becomes empty at time 43⅓. Each interval is a straight line because its rates are constant; its largest occupancy must occur at an endpoint. Checking only time 45 would miss the earlier 80 MB peak. Checking every rate-change endpoint, plus the moment of emptying, accounts for the complete trajectory.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Stop subtracting when the recorder is empty
The two contacts offer 6 × (10 + 15) = 150 MB of nominal service. Only 20 + 4 × 30 = 140 MB exists to send. All 140 MB is delivered in the nominal model, and the remaining 10 MB of service goes unused after the recorder empties. Continuing the downward line below zero would invent negative storage and incorrectly imply that later arrivals could use service from an earlier empty interval.
Total service alone therefore answers only part of the problem. An ample total can coexist with an earlier overflow, and service offered when no data is available cannot be saved as a credit. This is why the plotted recorder level is reflected at zero but initially left unbounded above for the capacity test. If that required curve exceeds the real capacity, a separate policy must decide whether to stop acquisition, defer work or lose data. The curve does not prove that overflowed bytes survived.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A late contact can overflow despite ample total capacity
Delay the first ten-second contact to time 18 through 28, leaving all other inputs unchanged. Before that contact, occupancy rises to 20 + 4 × 18 = 92 MB. It then falls to 72 MB at time 28 and rises to 80 MB at time 30. The required peak is now 92 MB, two above capacity. The nominal service total remains 150 MB, but the schedule fails its storage constraint before that service can help.
For a first contact starting at c and ending at c + 10, with 0 ≤ c ≤ 20, the required peak is the larger of 20 + 4c and 80 MB. The latter comes from the fixed acquisition total and first-contact service before time 30. Both must stay within 90 MB. Solving 20 + 4c ≤ 90 gives c ≤ 17.5 seconds. Starting exactly at 17.5 just fits this ideal model; real uncertainty would need an explicitly chosen margin. A late-contact case is not repaired merely by drawing a flat line at capacity.
Watch the recorder between contacts
Original continuous-flow teaching model, not MULA rates or recorder capacity. The delayed curve shows required storage without clipping at 90 MB; it cannot demonstrate that overflowed data survives. Both cases offer the same total service. Nominal delivery is 140 MB, with 10 MB of service unused after emptying.
Open full-size diagram in a new tab: Watch the recorder between contactsCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Connect the planned downlink to a prepared ground system
A smaller exercise uses 10 MB initially, a 45 MB capacity, arrivals of 3 MB/s through time 20, and service of 5 MB/s during 8–14 and 20–30. The endpoint levels are 34, 22 and 40 MB at times 8, 14 and 20. Emptying occurs at time 28. Seventy MB is sent and ten MB of service is unused. Moving the first contact to 12–18 raises the required peak to 46 MB. A six-second first contact can start no later than 11⅔ seconds under these assumptions.
Preparing an actual delivery service also requires ground infrastructure. PhilSA's 2025 report describes work on the Davao ground room, data centre and associated equipment; those preparations do not establish that the complete service was operating. Its June 2026 update still places MULA in testing. Use these dated reports to connect spacecraft and ground readiness, while keeping the exercise's invented rates separate. A delivery promise needs both an adequately prepared system and a feasible schedule for the data actually produced.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: PhilSA Annual Report 2024: MULA design, integration and payload workMay 2024 CDR and September 2024 IRR distinguish manufacturing approval from integration readiness. Review includes configuration, deviations and verification. Simultaneous capture/download appears as a planned feature. Flatsat, detector, communications and data-handling test captions connect the team to engineering work. 139,000 square kilometres daily is a design figure, not observed cloud-free coverage. The 150 kg reference differs from earlier 130 kg statements: omit mass rather than reconcile it without evidence. Gallery images and source diagrams are research-only, not copied into lessons.
- Read: PhilSA Annual Report 2025: MULA systems, fault protection and ground preparationReport describes continuing assembly/testing, validated critical FDIR functions, returning trained engineers, Davao ground preparation and intended agricultural validation work. Captions distinguish assembled bus, partial spacecraft and components. The report provides no fault-signature table, retry thresholds, detailed validation cases or flight results. Its completion percentage is dated reporting, not a readiness certificate. Page 171 expressly reserves reproduction rights; no gallery image is selected for publication.
- Read: PhilSA: satellite development update at the ninth Space Council meetingDated account reports assembled MULA undergoing environmental testing, possible April 2027 launch and test/retest schedule dependence. Domestic follow-on production is approved planning, not an operating constellation. Separate photograph identifies the main body before camera integration. No November 2026 operational assertion or completed launch. Photo configuration is earlier than the article’s assembled-spacecraft status. Public-domain page notice applies unless otherwise stated; do not transfer it to the separately restricted annual report.