Your goal for this lessonAccount for time allocated between service areas.
In this lesson 3 sections · 3 checks
Read & understand
Give each service area a time allocation
A hopping beam serves selected areas at different times. The schedule determines when a terminal can use the beam and how long it may have to wait. TASA lists beam hopping among Bellbird-3 and -4’s planned tests in its October 2026 announcement. The original schedule below explains the resource tradeoff; it is not a measured Bellbird operating cycle.
Assume one fictional beam and a repeating sixty-second cycle. Area A receives twenty seconds of service, area B receives thirty seconds, and switching or guard intervals occupy ten seconds in total. Service and unavailable time sum to sixty seconds. At a constant gross rate of four megabits per second while serving either area, A receives capacity for eighty megabits and B for one hundred twenty.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Calculate the volume and the waiting interval
The available gross volume is therefore two hundred megabits per cycle. Dividing by the full sixty seconds gives an aggregate cycle average of about 3.33 Mbit/s. The four Mbit/s rate applies only while serving an area. Ten unavailable seconds remove forty megabits of ideal capacity compared with uninterrupted service; those are foregone opportunities, not necessarily forty megabits of data that were actually queued or lost.
Payload bytes can be lower once framing, coding and retransmissions are included. Arrival time matters too. If A has one continuous twenty-second slot in each sixty-second cycle, its gap between service slots is forty seconds. A report arriving just after the slot ends waits almost forty seconds for the next slot to begin, before its own transmission and any queueing delay.
Allocate the full cycle
Original teaching model; not Bellbird flight design or measurements.
Open full-size diagram in a new tab: Allocate the full cycleHistorical communications experiment comparison: NASA photograph STS051-71-054 shows ACTS and its Transfer Orbit Stage after deployment from Discovery on September 12, 1993. ACTS included experiments with hopping spot beams. This is not Bellbird hardware, and the photograph does not measure a beam schedule or communications performance. The complete preserved frame is retained.
Look closely
Can a deployment photograph reveal the active beam schedule?
See what to notice
No. This historical ACTS image documents hardware and deployment context. A time allocation and communications records are needed to evaluate a schedule; it is not Bellbird hardware.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Compare schedules under explicit constraints
A different fictional allocation gives A thirty seconds, B twenty seconds and retains ten unavailable seconds. At the same active rate, their gross volumes become one hundred twenty and eighty megabits. Aggregate capacity is unchanged; who can use it has changed. Allocating twenty-five seconds to each area instead gives one hundred megabits each, but equal allocation is not automatically suitable for unequal demand or deadlines.
The ACTS deployment photograph offers a historical comparison: NASA’s earlier communications experiment included hopping-beam technology. Its visible antennas do not reveal a time allocation, and ACTS was not Bellbird. Judge a proposed schedule against demand, terminal availability and waiting-time requirements. More frequent visits could reduce waiting but also consume more switching time; quantify the actual schedule before claiming an improvement.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.