Lesson 4 of 4 · Require evidence across the complete delivery chain.
Verify each relay hop
8 minute lesson · 3 checks along the way
Your goal for this lessonRequire evidence across the complete delivery chain.
In this lesson 3 sections · 3 checks
Read & understand
Trace the complete route
A relay path can contain several distinct links. In an original fictional architecture, a ground terminal sends a message to satellite A, A forwards it to satellite B, and B downlinks it to a receiving station. Those three arrows represent separate interfaces. The end-to-end task is complete only when the intended destination receives the required information under the specified conditions.
Suppose the terminal-to-A test passes and the B-to-ground test passes, but no A-to-B result exists. The complete route remains unverified. Two successful outer links cannot fill a missing middle link. Even when all three links have passed individually, an integrated test must establish that the same intended message can cross their combination.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check message identity and delivery time
Assign a message identifier and preserve its content or a suitable integrity check at the relevant boundaries. A destination log containing a different message does not close this test. If the relay transforms the data intentionally, document the transformation and the expected output instead of requiring identical bytes without considering the design. Arrival time matters when the application specifies a delivery deadline.
A fictional route delivers the correct message after 140 seconds, but its requirement is delivery within 120 seconds. That trial demonstrates eventual delivery while failing the stated deadline. Conversely, a short transfer across one hop does not measure complete journey time; waiting for another link or processing step can contribute. Keep per-hop measurements and whole-route results separately interpretable.
Verify the full relay route
Original fictional exercise; not Black Kite measurements or flight design.
Open full-size diagram in a new tab: Verify the full relay routeHistorical relay comparison: NASA photograph STS043-72-002 shows TDRS-E with its upper stage during STS-43 deployment operations on August 2, 1991. This is not Black Kite hardware. The photograph documents a deployment scene, not successful data delivery through a complete relay path. The complete preserved frame is retained.
Look closely
Does this deployment scene establish successful data delivery through a relay?
See what to notice
No. The historical TDRS-E image documents deployment context. Operational message and timing evidence are needed to verify a relay path; it is not Black Kite hardware.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Separate a relay objective from its evidence
The historical TDRS-E photograph illustrates real relay spacecraft hardware during deployment operations. It does not depict Black Kite or demonstrate this fictional two-satellite architecture. A deployment image establishes a scene, while communication records establish a link’s behavior. Hardware presence, launch, individual link tests and integrated service are different kinds of evidence.
Rapidtek’s Black Kite descriptions include intersatellite ambitions; TASA’s October 2026 update places further launches in a later forecast window. Those statements do not establish a completed operational relay service. Public Ku/Ka descriptions vary by source and context, so this course does not assign a disputed band to an as-built crosslink. The central engineering requirement remains traceable delivery across every intended interface, with objectives and demonstrated results clearly separated.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Rapidtek: spacecraft and communication capabilitiesProduct descriptions and objectives, not measured service performance; no disputed as-built crosslink band asserted.
- Read: TASA: October 2026 startup constellation updateDated forecast for further Black Kite launches, not proof of a completed relay service.
- Read: NASA Systems Engineering Handbook: product verificationGeneral integrated-test and requirements framework, not NASA certification of Black Kite.