Lesson 3 of 4 · Independent constraints and calibration drift
Ask whether the channels are independent
18 minute lesson · 3 checks along the way
Your goal for this lessonExplain nonunique mixtures and test a response change with an independent diagnostic.
In this lesson 3 sections · 3 checks
Read & understand
Two channel numbers can repeat one constraint
Consider a different hypothetical instrument response: y₁ = S + B and y₂ = 2S + 2B. The second equation is exactly twice the first. Values of 100 and 200 are consistent with S = 80, B = 20, but also with S = 50, B = 50 or S = 20, B = 80. Two reported numbers do not automatically supply two independent mixture constraints.
Every nonnegative split with S + B = 100 fits this example. Longer observation of the same proportional responses would not identify the split even if counting noise became negligible. A new channel must respond differently enough to the components, or another justified observation must constrain one component. A desired scientific answer cannot substitute for that missing information.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
An old calibration can still produce an exact fit
Return to the original independent responses, but suppose the actual second-channel background coefficient changes from 2 to 1.5 while S = 80 and B = 20 remain fixed. The channels are now 100 and 70. This change is fictional; it illustrates why configuration and surrounding material belong in calibration records rather than claiming a particular ALIGN shielding effect.
If analysis incorrectly uses the old coefficient 2, it infers S = 260/3, approximately 86.67, and B = 40/3, approximately 13.33. Those components are positive and exactly reproduce 100 and 70 under the old equations. Positivity and a zero residual on the fitted channels have therefore failed to reveal the wrong response assumption.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Test a prediction that was not fitted
Add a separately calibrated diagnostic with response y₃ = S/5 + B/10, assumed unchanged in this example. The true components predict 18. The incorrectly inferred components predict 56/3, approximately 18.67. An exact diagnostic value of 18 distinguishes the stated true case from that particular old-model fit.
In a real experiment, the difference would need comparison with measurement and calibration uncertainty; no significance follows from the decimal difference alone. The diagnostic must also be sufficiently independent and its response applicable. Retain the configuration, coefficient provenance, input rates and prediction residuals. A changed shielding arrangement requires assessment of the response, not merely a new label on an old calibration file.
An exact fit can use a wrong response
Original exact-rate example. The third channel is assumed to retain its stated response and is not included in the original fit. Its disagreement is not a statistical confidence claim.
Open full-size diagram in a new tab: An exact fit can use a wrong responseRead diagram data as a table
| Case | S | B | Independent y₃ |
|---|---|---|---|
| Actual components | 80 | 20 | 18 |
| Old-response fit | 260/3 | 40/3 | 56/3 ≈ 18.67 |
Original exact-rate example. The third channel is assumed to retain its stated response and is not included in the original fit. Its disagreement is not a statistical confidence claim.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA NTRS: LEND source and background research abstractReviewed research abstract distinguishes lunar and spacecraft-background contributions. Do not transfer LEND percentages to ALIGN or present abstract review as full-paper review.
- Read: NARIT: August 2025 ALIGN developmentDated August 2025 concept, simulation and shielding work; proposed Chang’e-8 surface payload. English rover/lander wording is ambiguous; use lander consistent with Thai account.