Lesson 1 of 6 · Technology readiness and demonstrated capabilities
Ask what has actually been demonstrated
8 minute lesson · 3 checks along the way
Your goal for this lessonSeparate a physical principle, a tested component and a demonstrated mission capability.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Words with a dotted underline open a short definition right here in the lesson.
Read & understand
Readiness belongs to a claim
A technology can be promising without being ready for its intended mission. A laboratory experiment might establish that a detector responds to light, while a later test asks whether its electronics survive the expected temperature range. Those are different claims. Neither automatically establishes that a complete spacecraft can navigate, operate and return usable data.
NASA uses nine levels to describe increasing maturity. The scale runs from investigated principles toward successful use in an operational system. It is an ordered description of evidence, not a percentage-complete ruler. A level change does not imply a fixed amount of money or time remaining.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Match the environment and configuration
Read a readiness statement with its application attached. A mechanism demonstrated in Earth orbit may face different dust, temperature and loading on a lunar surface. Changes to materials, software or operating conditions can make earlier evidence less applicable. Ask what was tested, where, for how long and with which interfaces.
Consider a fictional pump tested for ten minutes at room temperature. A proposed mission requires repeated starts after cold storage. The original result supports the warm test case. A useful next experiment targets cold starts and the relevant duty cycle rather than simply repeating the easy demonstration. An absence of failures in one narrow trial is not proof about every operating condition.
Evidence before a readiness label
Original teaching diagram. DEMONSTRATED. Warm operation. One configuration. STILL TO TEST. Repeated cold starts. Integrated interfaces. A readiness claim retains its application and test conditions.
Open full-size diagram in a new tab: Evidence before a readiness labelCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Turn uncertainty into a development plan
A development plan identifies the missing evidence and the experiment that could provide it. It also connects the technology to the rest of the mission: a working pump still needs power, control, plumbing and suitable fluid conditions. Integration can introduce limitations that a component test never exercised.
Compare two proposals by demonstrated capability, remaining uncertainty and the consequence of failure. A mature component used outside its tested range may be less appropriate than a newer component tested for the actual application. Keep the assessment traceable so later results can change the decision. Readiness helps organize learning; it does not replace mission-level verification and validation.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.