Lesson 2 of 3 · Mass budgets and balance
Compare vehicle configurations
12 minute lesson · 3 checks along the way
Your goal for this lessonExplain why a launcher-family name is insufficient to establish payload compatibility.
In this lesson 4 sections · 3 checks
Read & understand
Keep the version and launch site attached
Diamant evolved from A to B and BP4. The first B launch took place at Kourou on 10 March 1970 with the German DIAL payload. CNES’s Guiana Space Centre history places the three BP4 launches in 1975. These are related configurations with different development and operational contexts. A specification copied from one version must not silently become a promise about every rocket carrying the Diamant name.
To compare services, identify the vehicle version, target orbit, payload assembly and relevant constraints. A statement that a launcher carries a particular mass is incomplete without the delivery conditions. An adapter, a separation device and a protective structure may also consume capacity. Those components remain part of the physical system even when a short description names only the scientific spacecraft. A budget should show what is included before anyone compares its total with a limit.
Read & understand
Add the complete payload assembly
Consider an invented allocation of 150 kg for a payload assembly. A spacecraft weighs 120 kg, its dispenser 12 kg and an adapter 8 kg. The total is 140 kg, leaving 10 kg of margin. Calling the spacecraft alone a 120-kg payload and reporting 30 kg available would hide hardware that the launcher still has to accelerate. The example teaches accounting; 150 kg is not a declared capacity for a Diamant variant.
Now increase the spacecraft by 20 kg while keeping the other pieces unchanged. The total becomes 160 kg, exceeding the allocation by 10 kg. The margin was consumed before the full increase was added. An engineering team could investigate a lighter interface, a different delivery condition or a different launcher, but it cannot repair the arithmetic by changing the label of the dispenser. Revisit the complete configuration whenever an included item changes.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check where the mass is located
Total mass is only one property. In a simplified rigid assembly with uniform gravitational acceleration, the center of gravity has the same weighted position as the center of mass: x̄ = Σ(m x)/Σm. Choose a reference plane and signed distances along one axis. Put 40 kg at −0.5 m and 60 kg at +0.4 m. The moments sum to −20 + 24 = 4 kg m, and the mass is 100 kg. The center lies at +0.04 m.
Add 20 kg at +0.8 m. The moment becomes 20 kg m and the total mass 120 kg, giving x̄ ≈ +0.167 m. The new component is only one-sixth of the final mass, yet it shifts the balance substantially because of its position. Replacing a component with another of equal mass can also move the center if its location changes. Equal totals therefore do not establish interchangeable payload configurations.
Equal mass does not mean equal balance
Circle sizes identify components schematically. The horizontal positions use a common coordinate scale; the added off-center mass shifts the weighted position.
Open full-size diagram in a new tab: Equal mass does not mean equal balanceCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Make compatibility a set of requirements
An acceptable center position would still leave other questions: available volume, attachment geometry, vibration response and electrical compatibility. Those requirements belong to the actual vehicle and mission documentation. Our one-dimensional model establishes only a weighted position for the stated point masses. It ignores flexible motion and does not calculate the response to launch loads. A successful arithmetic check should be labelled by the property it verifies.
Return to the historical family with that discipline. Preserve the version and date next to each result, and attach the orbit and assembly definition to performance comparisons. The move from Hammaguir to Kourou and the changes among Diamant versions form a development story rather than one timeless specification. A useful review records what changed, which requirements are affected, and what new evidence is needed before a result from an earlier configuration can be reused.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.