Lesson 2 of 3 · Fit payloads within shared limits
Fit payloads within shared limits
20 minute lesson · 3 checks along the way
Your goal for this lessonAccount for a common interface and explicit reserve, test payload combinations against volume, energy and peak-current constraints, and explain what scheduling can and cannot repair.
In this lesson 6 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A shared slot is not one slot per team
The SE4E CubeSat workshop for Philippine universities introduced educators to CubeSat subsystems; the later contest asked teams to propose mission payloads. The 2022 contest call described about 0.7U available in total for mission payloads on an ACCESS 2U CubeSat. A later preliminary presentation drawing labels a 1U hosted-payload region. Those descriptions may represent different allocation boundaries or stages; they cannot establish the same final usable volume. Treat the quantities with their source contexts. A proposal reviewer should ask which envelope, common interfaces and reserves the team has actually been allocated before accepting a dimensional claim.
For this exercise, set those historical figures aside and define a fictional 0.80U shared envelope. “U” here labels an allocated CubeSat-scale volume budget; a scalar total cannot describe every rail, connector, access path or irregular shape. Three indivisible candidate payloads, A, B and C, have volumes 0.30U, 0.35U and 0.25U. Any nonempty combination also needs one common interface occupying 0.07U. These teaching labels do not identify the real contest teams or their payloads.
Read & understand
Reserve space before allocation
The classroom allocation rule reserves ten percent of the entire 0.80U envelope. Reserved space is therefore 0.08U, leaving 0.72U for the selected payloads and their common interface. Removing the interface leaves 0.65U for payload bodies. State the denominator of a reserve rule: ten percent of the whole envelope differs from ten percent of whatever space happens to remain after other items are subtracted. Here the rule is fixed before comparing the options.
Combining A and B uses 0.30 + 0.35 + 0.07 = 0.72U. It reaches the allowed allocation exactly and leaves the separately reserved 0.08U untouched. A and C use 0.62U, while B and C use 0.67U. All three would use 0.97U, beyond even the original envelope. Count the common interface once per nonempty combination. Charging it to every payload overstates this particular shared item; omitting it understates the allocation. Other interfaces would need their own entries if the design required them.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Enumerate complete combinations
A second budget describes energy during one stated operating cycle. A needs 1.80Wh, B needs 1.50Wh and C needs 1.00Wh; the common interface needs 0.20Wh. The available allocation is 3.20Wh per cycle. A and B need 3.50Wh, A and C need 3.00Wh, and B and C need 2.70Wh. The combination that exactly fits the volume allocation, A plus B, fails this energy screen. Spare volume cannot compensate for an energy deficit.
List the full set of combinations: none, A, B, C, AB, AC, BC and ABC. The empty combination uses no payload-interface resource in this model but also delivers no payload service. Each single payload passes the numerical resource screens, yet that alone may not fulfill the mission. Exhaustive enumeration is manageable with three candidates and makes omissions visible. For a larger project, a search or optimization method can help, but the accounting conventions and mission requirements still determine what counts as a feasible result.
Read & understand
Energy and peak current answer different questions
The third budget concerns simultaneous current. Allocate peak bounds of 0.90A to A, 0.70A to B and 0.60A to C, plus 0.20A for the common interface. The allowed simultaneous bound is 1.60A. AB totals 1.80A, AC totals 1.70A and BC totals 1.50A. Thus BC is the only two-payload combination that passes all three initial screens. These sums assume the payload peaks may coincide; they are conservative allocated bounds, not measurements of an actual current waveform.
Energy measures accumulated use over the defined cycle, while peak current concerns a momentary electrical demand. An ampere is not a watt-hour, and neither value can be substituted for the other without additional information about voltage and time. The energy entries here are specified separately; peak current is not assumed constant throughout operation. A team should present both the integrated energy budget and the time-dependent load argument appropriate to its power system. Passing one does not prove the other.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Sequence loads only when the mission permits it
Suppose A and C could operate without overlapping. With the common interface active, their peak-current bound becomes 0.20 + max(0.90, 0.60) = 1.10A. Their cycle energy remains 1.80 + 1.00 + 0.20 = 3.00Wh because both operations still occur. Sequencing can alter when energy is used without reducing the total for this stated cycle. This conditional calculation explains a possible design change; it does not establish that an acceptable operating schedule exists.
Check whether the scientific measurements must be simultaneous, whether the available observation window is long enough, and whether switching introduces another load or delay. If those conditions prohibit sequencing, the original simultaneous screen applies. An alternate allocation shows how the preferred package can change: reduce the envelope to 0.75U while keeping the ten-percent reserve, lower available energy to 2.80Wh and lower simultaneous current to 1.40A. BC uses 0.67U against 0.675U available and 2.70Wh against 2.80Wh, but its 1.50A peak allocation fails the revised current limit.
A package must pass every resource limit
Original allocation example, not an actual spacecraft budget. Reserve is ten percent of the total envelope; the shared interface is counted once. Current values are coincident peak allocations, not measured waveforms. Volume totals do not prove geometric fit. Sequential operation requires compatible observations and a feasible timing plan.
Open full-size diagram in a new tab: A package must pass every resource limitCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Return an allocation with assumptions and open tests
A useful design-review result identifies which combinations passed each screen, which resource rejected the others, and which conditional operating changes need further work. For the initial simultaneous model, BC passes volume, energy and current together. That is a justified allocation result. It does not demonstrate geometric fit, correct connectors, acceptable thermal conditions or successful communications. A physical layout and interface review must test the assumptions hidden by the scalar volume accounting, including access needed during assembly and testing.
Keep reserve ownership clear when the design changes. If one team grows its payload, update the shared budget and obtain the appropriate agreement before using the remaining margin. A drawing that looks compact cannot replace that accounting. Equally, a spreadsheet with positive margins cannot replace tests of the assembled system. The next lesson assumes hard constraints have been screened and asks how to compare the remaining proposals when several can fit but offer different benefits and different levels of supporting evidence.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Nanosat Mission Idea Contest 2022The historical call gives four equally weighted proposal criteria and an approximate shared 0.7U payload allocation. The course uses a separately defined fictional budget.
- Read: PhilSA announces winners of Nanosat Mission Idea ContestThe November 2022 invitations lead into mission design; implementation remains subject to system constraints and subsequent payload decisions.
- Read: CubeSat as a Platform for Space Engineering Education and Nanosatellite R&D Collaboration with Philippine UniversitiesPages 8, 9 and 14 describe university collaboration alongside ACCESS. The preliminary 1U drawing label has a different context from the call’s available contest allocation.
- Read: Systems Engineering Handbook: 4.0 System Design ProcessesGeneral methods for connecting stakeholder needs, objectives, technical requirements, constraints and interfaces. Classroom timing and resource values are original examples.