Lesson 3 of 4 · Data volume, priorities and complete products
Budget a useful contact
8 minute lesson · 3 checks along the way
Your goal for this lessonCalculate a fictional contact budget and connect delivered files to usable observations.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Give rate and time compatible units
A ground contact offers a limited interval in which information can be transferred. For a deliberately simplified example, assume a constant rate of 512,000 bits per second for 180 seconds. Multiplying gives 92,160,000 transmitted bits. If the stated payload fraction is 80 percent after overhead, 73,728,000 of those bits carry the files being counted. At eight bits per byte, that is 9,216,000 bytes, or 9.216 decimal megabytes.
Every number in this example is invented. The constant rate, usable duration and payload fraction are assumptions, not published ET-SMART-RSS specifications. In a real assessment, each would need evidence for the relevant configuration and conditions. Defining whether a quoted rate includes overhead also matters: applying the same reduction twice would underestimate capacity, while ignoring an excluded overhead would overestimate it.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Choose complete information under a constraint
In the same classroom case, observation A is four megabytes, B is three and C is three. The user ranks A first, B second and C third, and requires complete files. All three total ten megabytes, exceeding the 9.216-megabyte budget. Taking A and B uses seven megabytes and leaves 2.216. The remaining space cannot hold all of C under the stated complete-file rule, even though it is not zero.
Priorities must be explicit. A different scientific question might prefer B and C, or permit a separately validated smaller product. That would be a different decision rule. Do not assume that a partial file supports the same interpretation as a complete one. A communications budget estimates an opportunity to transfer data; the product format and application determine which transferred information can actually be used.
A fictional contact has a finite payload
Fictional constant-rate example; overhead and complete-file priorities are explicit.
Open full-size diagram in a new tab: A fictional contact has a finite payloadCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep the observation attached to the bytes
A complete file still needs its target, acquisition time, source and processing information. Imagine that A arrives intact but its timestamp has been replaced by the download time. An analyst checking a rapidly changing field could mistake delivery freshness for a recent measurement. Preserve the observation identifier and the distinction between acquisition, processing and reception so the product can be matched to the user’s actual question.
A contact report can record scheduled capacity, successfully transferred bytes and accepted products as separate quantities. Failed packets, incomplete files or unsuitable acquisitions can make those figures differ. In our exercise, the budget is deterministic because its assumptions are fixed; it does not estimate a real mission’s reliability. The lesson is to account for information through each step instead of treating the size of a download as the final measure of success.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Ethiopian foreign ministry: December 2020 bulletinThe official bulletin records the 22 December launch announcement and the institute’s account of design collaboration.
- Read: Project lead interview: ET-SMART-RSS design partnershipOriginal October 2020 participant interview. Design roles are attributed testimony; its planned launch date is not the completed launch record.