Lesson 2 of 4 · Separate access opportunities, acquired scenes, valid observations and delivery.
Count usable observations
8 minute lesson · 3 checks along the way
Your goal for this lessonSeparate access opportunities, acquired scenes, valid observations and delivery.
In this lesson 3 sections · 3 checks
Read & understand
An opportunity is the start of a chain
A satellite may pass where it can observe a target, but access alone does not guarantee an image. The observation must be scheduled, acquired and transferred. The scene must then meet the user’s needs. For an optical flood map, cloud over the area of interest can make an acquired scene unsuitable even though the camera and downlink worked.
The dated NSTC plan describes more frequent observations through a constellation. Interpret that as an observing objective, not a promise that every location receives a fixed number of clear and usable scenes every day. A useful service description needs the target area, time interval, tasking assumptions and quality criteria as well as the number of access opportunities.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Work through one explicitly fictional day
In an original exercise, three scheduled opportunities occur at 08:00, 11:00 and 14:00. All three produce acquired scenes, but cloud obscures the study area in the first two. The last scene passes the stated quality check. For this exercise, usable yield is one accepted scene divided by three opportunities: 1/3, or about 33 percent.
That fraction answers a narrowly defined question. It is not an observed FORMOSAT-8 success rate or a long-term cloud probability. If you instead report acquired scenes divided by opportunities, the same example gives 3/3. Name the numerator and denominator so that “100 percent acquired” cannot be mistaken for “100 percent usable.”
Count accepted scenes with a stated denominator
Original fictional observation exercise; this is not a measured FORMOSAT-8 usable-image rate.
Open full-size diagram in a new tab: Count accepted scenes with a stated denominatorCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Delivery can still miss the decision
Suppose the accepted 14:00 observation in the fictional day reaches an analyst at 16:00. A request with a 15:00 deadline receives no accepted scene in time, despite the day’s one usable observation. This adds a fourth stage: availability to the person making the decision. Faster downlink capacity alone cannot resolve every delay in scheduling, processing, quality review or distribution.
Write a compact record with opportunity time, acquisition outcome, exclusion reason and delivery time. Use separate reasons for cloud, missing coverage or absent calibration information. Do not count a scene twice merely because two copies were delivered. When you compare days, keep the acceptance criteria and denominator consistent or explicitly describe the change.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: TASA: FORMOSAT-8 mission, timeline and payload tabsTimeline identifies FS8A launch in November 2025; FS8B launch is planned for February 2027. The November 2026 FS8B review remains scheduled, not completed solely because the month has arrived. General design lists 561 km sun-synchronous orbit, approximately 400 kg and 500 Mbps image downlink. The optical tab gives one panchromatic and six multispectral channels, with nadir GSD of 1 m and 2 m respectively. Common interfaces and domestic component development coexist with commercial off-the-shelf parts. Science and secondary payloads have roles distinct from the principal imaging payload. Specifications are design values, not independent scene-performance validation. Current mission interface did not expose the older six-plus-two overview paragraph; constellation membership is independently grounded in the dated NSTC release. The general 2025–2030 schedule and the older NSTC 2031 completion plan differ; do not merge them into one guaranteed completion date.
- Read: NSTC: FORMOSAT-8 preparation visit and constellation planMay 15, 2025 release describes six high-resolution plus two finer-resolution optical satellites, with planned completion in 2031. It describes native 1 m sampling for the first six and less than 1 m for the final two. Its then-planned October 2025 first launch is superseded by the current operator timeline recording November 2025. The three-per-day observation objective is a constellation planning claim, not a guarantee of three clear images of every location. Retain the release date for plan claims. Do not infer a particular vehicle-recognition accuracy from pixel spacing. Do not treat image interpolation as additional independently resolved detail.