Lesson 2 of 3 · Contact windows and causality
Choose an arrival path
11 minute lesson · 3 checks along the way
Your goal for this lessonChoose a message route using contact windows, transfer duration and whole-message causality, then test readiness against a deadline.
In this lesson 4 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Carry the message through a complete route
Gonets communication involves user terminals, spacecraft and ground facilities. The designers’ 2013 system description identifies regional stations and a historical configuration without spacecraft-to-spacecraft links. A complete delivery therefore requires more than selecting the first available uplink. We can investigate that distinction with two fictional satellite routes, A and B, each linking a sender to a ground receiver.
A 60 kB message is ready at t = 0; use decimal kilobytes and minutes throughout. Each transfer must fit contiguously inside one listed contact. A satellite must receive the entire message before forwarding any of it. There is no fragmentation, streaming, partial-transfer carryover or link between A and B. Rates refer to usable payload, buffers are large enough, and each route is evaluated independently without competing traffic. These are teaching assumptions, not a reconstruction of Gonets protocols.
Andrei Morgunov photographed Rokot during Gonets-M launch preparations at Plesetsk in July 2014. The satellites are enclosed; the photograph shows deployment hardware, not a measured message-delivery time. The complete original frame is retained.
Look closely
Can this photograph establish how soon a message reached a monitoring center?
See what to notice
It shows launch preparation hardware. Delivery timing needs contact windows, message size, usable rates and evidence from the receiving endpoint.
Read & understand
Test the early route against its windows
Route A offers an uplink from t = 2 to 4 at 30 kB/min. Its sixty kilobytes take two minutes, finishing at t = 4. An early ground contact runs from t = 3 to 5 at the same rate. Although that window has sixty kilobytes of total capacity, the complete message is unavailable at t = 3. Starting at four would finish at six, after contact ends. The early ground contact cannot carry this whole message.
For each link, compute finish = max(data-ready time, window start) + message size / payload rate. The link is usable only if finish ≤ window end. The next A ground contact runs from t = 18 to 20 at 30 kB/min, so reception finishes at twenty. A fixed two-minute ground validation then makes the message ready for the intended application at t = 22. Finishing exactly at a window end is allowed in this exercise.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Compare arrival times, not first departures
Route B offers an uplink from t = 5 to 8 at 20 kB/min, followed by a ground contact from t = 10 to 13 at 20 kB/min. The uplink finishes at eight, ground reception at thirteen and validation at fifteen. Route B uploads later but becomes useful seven minutes before route A. For a readiness deadline of t = 16, B passes. For t = 14, neither route passes, even though B reaches the ground before fourteen.
Now shorten only B’s ground window to t = 10 through 12. Its payload capacity becomes forty kilobytes, too little for the sixty-kilobyte message. Under the stated whole-message rule, route B is unavailable and A’s ready time of twenty-two becomes the earliest among the listed routes. This is not a prediction that delivery is impossible through every route a real system might have.
The later uplink can deliver first
Original whole-message route exercise. Each transfer must fit one window after the complete message is available. Times, rates and validation durations are invented; routes are compared independently.
Open full-size diagram in a new tab: The later uplink can deliver firstCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A smaller message can change which path wins
Return to the original windows and reduce the message to 40 kB. A’s uplink takes 4/3 minutes, finishing at t = 10/3. The early ground contact is already open, so forwarding begins immediately and finishes at t = 14/3, before five. Add validation: readiness is t = 20/3, about 6.67 minutes. A now beats B because the smaller message fits both early contacts in the required order.
The launch photograph establishes hardware and setting; a transfer calculation requires a separate schedule and data record. Actual planning also needs uncertain contact times, access rules, failures, overhead, buffer limits and confirmed receipt. Our deterministic model shows exactly why earliest upload and earliest useful delivery can disagree, while leaving those operational questions explicit.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Gonets designers: development of the low-orbit systemKuzovnikov, Testoedov and Agureev, 2013, pages 158–163. The historical waiting-time tables depend on a stated configuration and latitude. Our contact times and rates are invented; the paper is not evidence of present service performance.
- Read: Gonets operator authors: systems and monitoring applicationsDiordiev and Panasov, 2021, printed pages 77–78. Distinguishes low-orbit Gonets from geostationary Luch and describes monitoring uses. Dated fleet totals and future proposals are not current operating evidence.