Lesson 2 of 3 · Geographic routing and constrained capacity
Allocate traffic through a beam–gateway map
12 minute lesson · 3 checks along the way
Your goal for this lessonCalculate feasible traffic on a stated routing graph and distinguish aggregate capacity from usable capacity at each location.
In this lesson 4 sections · 3 checks
Read & understand
A coverage pattern is connected to a network
GSAT-11, launched in December 2018, uses multiple spot beams and gateway connections to support high-throughput communications. A spot beam concentrates coverage over a geographic region; a gateway connects the satellite system to a terrestrial network. These are different roles in an end-to-end path. An advertised total capacity does not tell an individual terminal how much service is reachable through its beam, compatible equipment, assigned resources and gateway. The network’s connections matter alongside the capacity of its parts.
ISRO’s GSAT descriptions identify distinct payloads across the family, rather than a single arrangement shared by every spacecraft. Our example below is a deliberately invented graph, not a wiring diagram of GSAT-11 and not evidence that its payload can dynamically switch any beam to any gateway. A proposed routing change is meaningful only if hardware, spectrum, software and operating agreements permit it. Draw those permitted connections before adding their capacities or promising a service to a location.
Read & understand
Find stranded capacity in the original graph
Suppose beams A, B and C have simultaneous net demands of 8, 8 and 2 megabits per second. Assume each beam can carry its full demand; gateways are the limiting resources in this example. Two gateways, G1 and G2, each support 12 megabits per second. The only permitted routes send A and B through G1, and C through G2. Total demand is 18, while the sum of gateway capacities is 24. That sum appears comfortable but does not respect the route assignments.
G1 receives demand 16 and can deliver at most 12. G2 receives only 2 and delivers 2, so the maximum delivered total is 14 megabits per second under this graph. A fair example allocation gives A six, B six and C two. Four units of demand remain unserved even though G2 has ten units of unused capacity. Those unused units are stranded for A and B because neither has a permitted route to that gateway. Capacity at an unreachable resource cannot repair the overloaded resource.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Evaluate a routing change as a conditional option
Imagine that a different, explicitly permitted configuration can move B to G2 while A remains on G1 and C remains on G2. G1 then carries A’s eight; G2 carries B’s eight plus C’s two, totalling ten. Both are within their twelve-unit limits, so all eighteen units can be delivered in the simplified model. The improvement requires a new feasible connection. It does not follow merely from drawing a line on a slide or knowing the sum of the gateway capacities.
Another option under the original fixed graph is to increase G1’s capacity from twelve to sixteen while leaving G2 at twelve. That also serves all eighteen units. Increasing only G2 from twelve to twenty would not help the original overload: A and B still share the twelve-unit G1 path. These comparisons separate upgrading a resource from changing which users can reach it. Their actual cost, implementation time, reliability and compatibility would need evidence beyond the arithmetic supplied here.
Unused capacity must be reachable to help
Only the original routes are drawn. The alternative connection is hypothetical and does not claim an actual GSAT payload can switch arbitrarily.
Open full-size diagram in a new tab: Unused capacity must be reachable to helpCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check the boundaries of the feasible total
The eighteen-unit result assumes simultaneous traffic can use the stated net capacities without additional overhead or interference losses. It also assumes downstream terrestrial routes and destination equipment can keep up. Introduce another bottleneck and the achievable end-to-end result may fall. Conversely, demand that moves to a different time interval may be served by scheduling, if the application tolerates that delay. Keep geography, route eligibility, time and traffic requirements visible instead of treating all unused capacity as freely interchangeable.
A useful service review therefore records the demand at each location, the permitted path, the capacity at each shared resource and the proposed operating configuration. Check each constraint before claiming the aggregate result. GSAT’s varied communications architectures provide a real setting for this reasoning, but the fictional graph proves only its own conditional allocation. Mission photographs establish historical hardware or launch scenes; a functioning regional service needs dated configuration and performance evidence from the network that actually carries the traffic.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.