Lesson 3 of 3 · Verification, validation and continuity
Ask for readiness evidence
8 minute lesson · 3 checks along the way
Your goal for this lessonDescribe evidence that would support successive readiness claims for a proposed service.
In this lesson 3 sections · 3 checks
Read & understand
Give each claim a matching test
A proposal, a contract, completed hardware, a launch and an accepted service are different kinds of milestones. Evidence should match the claim being made. A supplier agreement can establish an obligation without proving hardware completion; an orbital launch record can establish flight without demonstrating every ground endpoint.
In an original readiness review, create a row for each required function, the responsible team and the evidence needed to accept it. Mark an unperformed test as open. Repeating an announcement does not close an engineering requirement, and a passing subsystem test does not silently close all system-level work.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check both conformance and usefulness
Verification asks whether a system meets its specified requirements. Validation asks whether it addresses the intended user need in its use context. A terminal might pass a laboratory throughput check while a school’s actual application remains unusable because the test omitted an essential operating condition.
For a fictional acceptance exercise, first test the defined link requirement, then run the intended application at the school with the agreed conditions. If the second test exposes a missing need, revise the design or requirements openly. Keep the result as evidence for improvement rather than calling the failed use case a success.
Readiness evidence must match the claim
Advance only the milestone supported by evidence; launch, commissioning and user acceptance are distinct.
Open full-size diagram in a new tab: Readiness evidence must match the claimCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Plan continuity before claiming it
A proposed replacement service must account for installation, compatible terminals, support and the transition from earlier arrangements. Historical VENESAT-1 experience supplies questions to ask, but it does not answer them for Guaicaipuro. A customer’s need can continue while a new system remains in development.
The next historical update should add dated evidence for whatever stage was actually completed, including the source and remaining limits. If a launch is later confirmed, record it without automatically declaring commissioning or universal service. This leaves the proposal’s history open to evidence while preserving the distinctions that make it understandable.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA: system design processesSystems Engineering Handbook comparison: clarify stakeholder expectations, derive technical requirements and evaluate design alternatives iteratively. The course exercises are original teaching examples, not documented Guaicaipuro contracts, specifications or NASA oversight of the project.
- Read: Venezuelan foreign ministry: October 2025 announcementPresidential Press account dated 30 October 2025 discusses accelerating the Guaicaipuro communications project with China and separately describes a domestic minisatellite ambition. It does not supply launch or commissioning evidence.
- Read: Venezuela: 2021 COPUOS statementNational statement, pages 2–4: historical imaging services, VENESAT-1 service ending in the first half of 2020, reported disposal and training. Read as a dated national account, not independent performance or orbit verification.