Lesson 1 of 4 · A first satellite and its evidence
Separate release from results
8 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish a documented deployment, initial communication and verified payload results.
In this lesson 3 sections · 3 checks
Read & understand
Learn through a shared mission
GuaraniSat-1 joined Japan’s Tsuru and the Philippines’ Maya-2 in BIRDS-4. JAXA identifies the Paraguayan Space Agency and Kyutech as its developers. The project connects a national learning effort with a shared CubeSat development and deployment framework. A family name describes that cooperation; each satellite still has its own identity and operating record.
A useful mission history follows the work as well as the hardware: who builds and checks an interface, who receives the first signal, and who interprets an experiment? These roles can overlap without becoming interchangeable. The preserved photograph in this lesson shows the earlier BIRDS-3 group, not GuaraniSat. The JAXA reading links photographs of the actual BIRDS-4 release.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Put events on separate lines
Kyutech reported release from Kibo on 14 March 2021 at 20:20 Japan Standard Time. An hour later its ground station confirmed the Japanese and Paraguayan beacons; amateur operators received the Philippine satellite. The next-day report described health evaluation before activating experiments. That sequence distinguishes a release event from reception and subsequent mission work.
Consider an original classroom log: release at 10:00, a recognizable beacon at 11:00, a decoded temperature at 11:04 and an experiment still disabled. Each entry supports a different claim. Even a correctly identified beacon does not show that an instrument has acquired and returned a usable dataset. Keep timestamps and the identity of the receiving station with each event.
Give each milestone its own evidence
A successful earlier step does not establish the later steps.
Open full-size diagram in a new tab: Give each milestone its own evidenceBIRDS-3 spacecraft Uguisu, Raavana-1 and NepaliSat-1 after release on 17 June 2019, photographed by NASA astronaut Nick Hague. This earlier deployment is a comparison for shared CubeSat access. It does not show GuaraniSat-1, GuaraniSat-2 or the BIRDS-4 campaign; individual positions are not identified.
Look closely
Which deployment does this preserved photograph document?
See what to notice
It documents the earlier BIRDS-3 group in 2019. It illustrates shared release geometry, but it is not an image or operating record of either GuaraniSat spacecraft.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Continue the lineage without copying its results
GuaraniSat-2 extends Paraguay’s development work through AEP and university collaborators. AEP’s December 2025 overview describes satellite-building and operating experience among its objectives. FIUNA’s 2 October 2026 account and the launch provider’s Transporter-18 record support a 1 October launch. Older development pages still speak of that launch as future work.
Read a source’s date and the event it reports together. Use the newer launch record for that event while retaining older documents for design intent and test history. A launch does not establish successful commissioning, a completed experiment or present-day availability. Those claims require later spacecraft-specific evidence; this course does not supply an unreviewed science result.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Kyutech: BIRDS-4 release and first beacons15 March 2021 report documents the previous day’s release and initial beacon reception. Health evaluation preceded activation of experiments; it is not a payload-results paper.
- Read: JAXA: eight CubeSats deployed from Kibo15 March 2021 account identifies GuaraniSat-1, Maya-2 and Tsuru as BIRDS-4. Deployment photographs show the actual campaign; the course’s preserved BIRDS-3 photo is separately labelled as comparison context.
- Read: AEP: GuaraniSat-2 mission overview, December 2025Seven-page agency presentation: educational objectives, payloads and the space/ground system. The dated development timeline is a plan, not confirmation that every listed milestone occurred.
- Read: FIUNA: the MUA instrument on GuaraniSat-22 October 2026 instrument-team account reports the 1 October launch and describes detection, processing and planned particle measurements. Later paragraphs retain prelaunch wording; no commissioning or scientific result is inferred.
- Read: SpaceX: Transporter-18 mission recordPrimary launch-provider page reports the 1 October 2026 launch from Vandenberg. Its approximate deployment timeline lists GuaraniSat-2; a schedule entry is not independent spacecraft telemetry.