Lesson 3 of 3 · Verification and coupled failures
Build a test that can answer the question
12 minute lesson · 3 checks along the way
Your goal for this lessonMatch tests to claims and distinguish independent redundancy from a shared failure path.
In this lesson 4 sections · 3 checks
Read & understand
Choose a claim that a test can actually address
A development programme needs evidence before anyone can rely on its proposed capability. For a spaceplane, a wind-tunnel run can examine aerodynamic behaviour under selected conditions, while a material test can examine a thermal response. Neither alone demonstrates a complete flight. Begin with a specific claim: a control surface generates the expected force over a defined range, or a material retains a property after a defined exposure. The question determines what must be measured.
Hermes remained a development project, so planned missions cannot be counted as completed validation. At the same time, the absence of flight does not make every ground investigation meaningless. The right question is what a particular test established and where extrapolation begins. A model tested at one scale, speed and temperature supplies evidence under those conditions. A broader claim needs a justified relationship to the vehicle and environment it is intended to represent.
Read & understand
Use a matrix to expose missing combinations
Construct an original test matrix with two temperatures, cool and hot, and two supply conditions, nominal and reduced. There are 2 × 2 = 4 combinations. If each combination is tested three times, the plan contains twelve runs. Testing only cool with nominal supply and hot with reduced supply covers two combinations, even if each is repeated many times. Repetition improves information about those tested combinations; it does not fill the untested cells.
The missing cool/reduced and hot/nominal cases matter when the effect of one condition depends on the other. To isolate that possibility, compare supply changes at the same temperature, then compare those differences across temperatures. Also vary or balance run order where practical, because a component that ages during testing could otherwise make the later condition appear worse. Keep actual temperatures, voltages and timestamps rather than relying only on labels in the plan.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Calculate redundancy only under its assumptions
Imagine two fictional channels, each with a 0.02 probability of failure during one specified test interval. If their failures are independent and either functioning channel is sufficient, the probability that both fail is 0.02 × 0.02 = 0.0004, or 0.04 percent. The result depends on independence, the shared interval and the success criterion. It is not a measured reliability for Hermes or a general guarantee for duplicated equipment.
Now introduce an independent shared-supply failure probability of 0.01 that disables both channels. When that event does not occur, retain the earlier independent channel model. Total failure probability becomes 0.01 + 0.99 × 0.0004 = 0.010396, or 1.0396 percent. The common event dominates the result. Multiplying the two channel probabilities while omitting the shared supply would therefore give a misleadingly optimistic estimate under the revised assumptions.
A shared failure changes the calculation
The branches are mutually exclusive. Include the shared event before claiming the benefit of redundant channels.
Open full-size diagram in a new tab: A shared failure changes the calculationCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Connect the result to a decision
A failed test should lead to a documented explanation, a design change or a narrower claim, followed by suitable verification. Repeating a test until one run passes does not erase earlier failures. Conversely, changing a component may invalidate previous evidence about interfaces that now behave differently. Track which test results apply to which configuration and why. An acceptance rule written before testing helps prevent the preferred outcome from redefining success afterward.
For the fictional redundant system, test the channels individually, the transfer between them and the shared paths that could defeat both. The probability calculation identifies a concern but does not reveal every physical failure mechanism. Inspection, analysis and experiments contribute different information. A complete development decision weighs the remaining gaps alongside resources and mission goals. Studying Hermes is an opportunity to practise that reasoning while preserving the distinction between an attractive proposal and demonstrated capability.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: ESA: Hermes spaceplane developmentHistorical summary of changing configurations, approval in 1987 and cancellation in 1992. Planned performance is not flight performance.
- Read: NASA Glenn: the drag equationDefines dynamic pressure and the need to specify the reference area used with an aerodynamic coefficient.