Lesson 4 of 4 · Resource upgrades and individual outcomes
Choose an effective upgrade
17 minute lesson · 3 checks along the way
Your goal for this lessonCompare local and shared capacity upgrades, including unchanged aggregate delivery and changed user allocations; state what the model cannot establish.
In this lesson 3 sections · 3 checks
Read & understand
Change one limit while keeping the others fixed
First increase only the gateway from 120 to 150. The early stopping points remain a = 10 and b = 20. Terminals c and d can now rise to 60 each, where their own beams stop them. The result is (10, 20, 60, 60), totaling 150. Increasing that gateway again to 160 produces no further gain: the beam-and-demand ceiling remains 150, leaving 10 of gateway capacity unused.
An upgrade to beam B alone, from 60 to 90 with the original 120 gateway, also leaves the baseline rates unchanged. Terminal c had been stopped at 45 by the shared gateway, before its original beam limit. Adding capacity to a resource that was not limiting the allocation does not remove the actual bottleneck. This conclusion follows from the stated workload and policy; a different demand pattern could change it.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Watch distribution as well as the total
Now increase only beam A from 30 to 60 while retaining the 120 gateway. Terminal a still stops at 10. The other three then share the remaining 110 equally, so b, c and d each receive 110/3, approximately 36.67. Beam A carries 140/3, approximately 46.67, below its new limit. The gateway still carries 120.
Terminal b improves from 20 to about 36.67, while c and d each fall from 45 to about 36.67 under equal filling. The upgrade has changed access to shared capacity without increasing total delivery. That is not a failed arithmetic result: the policy reallocates capacity toward a previously constrained user. State whose outcome matters before calling one design better. If both beam A becomes 60 and the gateway becomes 160, the same rule gives (10, 50, 50, 50).
More capacity, different outcomes
Original fictional upgrade comparison on one linear total-rate axis. Exact fractional rates appear in the table; equal filling is not a claim about the real IPSTAR scheduler.
Open full-size diagram in a new tab: More capacity, different outcomesRead diagram data as a table
| Change | a | b | c | d | Total |
|---|---|---|---|---|---|
| Baseline | 10 | 20 | 45 | 45 | 120 |
| Gateway 150 | 10 | 20 | 60 | 60 | 150 |
| Gateway 160 | 10 | 20 | 60 | 60 | 150 |
| Beam A 60 | 10 | 110/3 | 110/3 | 110/3 | 120 |
| A 60 + gateway 160 | 10 | 50 | 50 | 50 | 160 |
| Beam B 90 only | 10 | 20 | 45 | 45 | 120 |
Original fictional upgrade comparison on one linear total-rate axis. Exact fractional rates appear in the table; equal filling is not a claim about the real IPSTAR scheduler.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Turn the exercise into an evidence question
A practical investigation would need the actual resource mapping, usable capacities, traffic demands and allocation rules for the relevant time and service. It would also need measurements of losses, latency and application success before translating a steady-rate allocation into a user-experience claim. Our worked cases isolate one reason why a regional total cannot be promised at every terminal.
IPSTAR’s historical architecture made broadband access a coordinated space-and-ground undertaking. Its dated retirement record adds another distinction: capacity on a historical spacecraft and continuity for a particular customer are separate matters. Neither a larger number in a capacity table nor a disposal milestone proves that a school can complete its online task. Connect the technical model to the evidence the real question requires.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Thaicom: IPSTAR historical architectureHistorical spot-beam/frequency-reuse/gateway architecture and operator-reported aggregate capacity; retain historical attribution.
- Read: GISTDA: November 11, 2026 decommissioning accountNovember 11 2026 GISTDA dated decommissioning status; do not claim completed disposal.