Lesson 2 of 3 · Terrain reconstruction, integration and uncertainty
Reconstruct a Martian valley volume
16 minute lesson · 3 checks along the way
Your goal for this lessonIntegrate terrain cross-sections and quantify how an assumed earlier surface and missing topography affect a valley-volume estimate.
In this lesson 4 sections · 3 checks
Read & understand
Turn stereo terrain into a geological question
HRSC uses observations from several viewing directions to help reconstruct topography. Its products support geological measurements: the instrument team’s 2009 account describes using valley cross-sections and channel depths to investigate erosion. A terrain model describes the surface that survives. Estimating material removed also requires a reconstructed earlier surface, which is a geological assumption rather than another directly observed layer.
The preserved Arabia Terra image is a nadir HRSC observation from October 26, 2009. Its scale bar and north arrow help orient the scene, but this resized display is not a calibrated elevation grid. The source’s acquisition sampling cannot be applied directly to its displayed pixels. For the following original exercise, use the supplied terrain measurements instead. They describe an invented valley corridor and are not measurements extracted from this photograph.
Read & understand
Integrate across the valley, then along it
Let zref(s,y) be a proposed earlier elevation and znow(s,y) the mapped present surface, in kilometres. Here s runs along a fixed corridor and y across it. Within that corridor, assume the deficit zref − znow is nonnegative. Its cross-sectional area is A(s) = ∫(zref − znow)dy, in km². For example, a triangular section 2 km wide and 0.3 km deep has area 0.3 km². A rectangle at maximum depth would double that area and misrepresent the stated shape.
Suppose measured sections at s = 0, 2, 5 and 9 km have deficit areas A = 0, 0.3, 0.6 and 0.2 km². Assume A changes linearly between each adjacent pair. Integrate with V = ΣΔs(Aleft + Aright)/2. The three segments contribute 0.30, 1.35 and 1.60 km³, for V = 3.25 km³. The intervals are unequal, so multiplying the unweighted mean of the four section areas by nine kilometres does not implement this model.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Measure the consequence of a different earlier surface
Now raise the entire proposed reference surface by 50 m, or 0.05 km, while keeping the present terrain and corridor fixed. The widths at the four stations are 1, 2, 3 and 1 km, with width also linear between stations. Their integrated plan area is 2(1 + 2)/2 + 3(2 + 3)/2 + 4(3 + 1)/2 = 18.5 km². Each column gains 0.05 km of deficit, so the volume increases by 0.925 km³ to 4.175 km³.
This change has not eroded any additional rock; it changed the reconstruction being compared with the same present surface. If both present and reference elevations were shifted equally, their difference would stay unchanged. The formula ΔV = δ∫w ds depends on a fixed corridor and no clipping of negative deficits. Letting the corridor expand to new intersections, or imposing zero wherever the reference falls below terrain, would require recalculating its geometry rather than applying the same area blindly.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Bound a gap without calling it empty
Return to the original reference, but suppose the section at s = 5 km cannot be measured reliably. Independent constraints only place its area between 0.4 and 0.8 km². Keep the other sections and linear interpolation. Algebra gives V = 1.15 + 3.5A5, so the permitted volumes span 2.55–3.95 km³. The coefficient 3.5 km combines half of each neighbouring interval. Filling the missing section with zero would add an unsupported physical claim and push the result below the stated range.
An alternate supplied terrain uses areas 0.1, 0.4, 0.5 and 0.3 km² at the same stations. Its volume is 3.45 km³. Lowering its reference by 20 m subtracts 0.37 km³, giving 3.08 km³, provided all deficits remain nonnegative over the fixed corridor. Such a volume is a reconstruction-dependent geometric deficit, not automatically the water volume, sediment mass or duration of a flood. Later infill, material density and transport history require additional evidence before those questions can be answered.
Integrate terrain sections over their actual spacing
Integrating the actual station intervals gives 3.25 km³. A different earlier surface shifts the result, while a missing section leaves a volume interval. The photograph supplies mission context, not these invented measurements.
Open full-size diagram in a new tab: Integrate terrain sections over their actual spacingCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: ESA: HRSC terrain processing and valley studiesPrinted pages 23–24 explain stereo terrain products; printed page 45 gives valley and channel applications. The section areas and reference changes here are invented.
- Read: ESA: Mars Express instrumentsHRSC viewing directions and topographic role; historical design descriptions are not a present coverage guarantee.
- Read: ESA: Arabia Terra HRSC observationOfficial image caption identifies the October 2009 nadir observation and instrument credit. The preserved image record retains the specific licence; acquisition resolution does not describe pixels in the resampled display.