Lesson 3 of 4 · Subsystem and end-to-end acceptance
Verify the connected station
8 minute lesson · 3 checks along the way
Your goal for this lessonDesign acceptance checks that distinguish individual hardware tests from the connected service.
In this lesson 3 sections · 3 checks
Read & understand
Build a trace from requirement to result
A fictional site requirement says the user must receive a complete test file with correct identifiers within a defined interval. A test record should identify that requirement, the configuration, supplied inputs, observed output and decision. Without the link to a requirement, a successful test can be impressive but irrelevant to the particular service being accepted.
Subsystem checks still matter. A drive can track a reference direction, a receiver can decode a controlled input and a local network can transfer a file. Those results support individual properties. The combined test then checks whether the interfaces work together under the chosen configuration. It should not be replaced by an assumption that independently passing parts always produce a passing system.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Inspect the final receiving end
In an invented acceptance run, the station receives a valid file at 14:02 but the intended user receives it at 14:09. The requirement was delivery by 14:06. The station reception succeeded; the end-to-end deadline failed. Stopping the test at the antenna would miss that distinction. The acceptance decision should inspect the output where the agreed service actually ends.
Now suppose the user receives the file on time but its observation identifier belongs to the wrong test case. Timeliness does not cure incorrect content. Define each acceptance criterion separately and preserve the result for each. This makes a failure actionable: the next investigation can focus on the late forwarding step or the identity mismatch instead of treating the entire station as an unexplained black box.
Inspect the agreed receiving end
Fictional acceptance run: an intermediate success does not satisfy every service criterion.
Open full-size diagram in a new tab: Inspect the agreed receiving endCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A change can invalidate part of an earlier result
After a fictional test passes, the team changes the decoding software. The mechanical pointing result may still be relevant, but the earlier end-to-end interpretation result does not automatically cover the new software. Identify which requirements and interfaces the change could affect, then repeat the relevant checks. This is more precise than either assuming every old result still applies or declaring all prior work worthless.
Record a versioned baseline with the acceptance evidence. A later operator can then ask which configuration was tested and whether the active system matches it. The lesson’s examples describe a method for reasoning about evidence; they are not Matjiesfontein’s actual acceptance criteria or an assertion that a specific installation problem occurred there.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: SANSA: July 2026 Matjiesfontein construction updateDated construction and local-partnership account. Its 18–24 month completion forecast does not establish accepted operation.
- Read: NASA: spacecraft telecommunicationsGeneral principles for a communications path, distinct from any unreviewed Matjiesfontein specification.