Lesson 2 of 3 · Schedule energy with a reserve
Schedule energy with a reserve
20 minute lesson · 3 checks along the way
Your goal for this lessonFind a feasible mix and ordering of operating modes while accounting for reserve and finite battery capacity.
In this lesson 6 sections · 3 checks
Read & understand
Several experiments share one power system
Maya’s small spacecraft combined radio, computing, sensing and imaging tasks. The Maya-5/6 presentation distinguishes the onboard computer, electrical power system, communications subsystem and ground system, while listing several experimental missions. Those functions need resources at particular times. A mission list alone says little about whether every requested activity can run together, and objectives do not establish achieved flight performance. The Maya-3/4 specification likewise distinguishes operating modes in its energy budget.
We will build a separate classroom model instead of using uncertain historical table totals as flight performance. Imagine six equal accounting intervals, called orbits for this exercise. Each supplies 0.9 watt-hours of usable energy. Quiet mode Q consumes 0.7 Wh per orbit; active mode A consumes 1.3 Wh. Each cost covers the entire selected mode, so do not add the quiet cost again when choosing A. A watt-hour measures energy; an average power in watts would require the interval duration.
Read & understand
First bound the number of active orbits
Begin with 2.0 Wh stored, require at least 1.6 Wh at every modeled orbit boundary, and cap storage at 2.4 Wh. Equality with the reserve is allowed. Quiet mode adds a net 0.2 Wh, whereas active mode removes a net 0.4 Wh. If all six slots were quiet, the unconstrained final total would be 3.2 Wh. Replacing one quiet slot with an active one reduces that total by 0.6 Wh. For n active slots, the no-spill final energy is therefore 3.2 − 0.6n Wh.
Requiring that optimistic final value to reach 1.6 Wh gives n at most 2⅔, so an integer plan can contain at most two active slots. Three would finish at only 1.4 Wh even before storage losses. The bound does not yet prove that two are feasible: the reserve must hold throughout the sequence, and a full battery can discard later incoming energy. A necessary total-budget condition is only the first part of the scheduling problem.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check the path, not just the final balance
Use the sequence Q A Q Q A Q. After each interval, add the 0.9 Wh harvest, subtract that mode’s cost, and limit the result to the 2.4 Wh capacity. The six stored values are 2.2, 1.8, 2.0, 2.2, 1.8 and 2.0 Wh. Every boundary stays at or above 1.6 Wh, and none reaches the capacity. This example supplies the missing constructive proof that two active intervals are feasible within the declared model.
Now reorder the same activities as A A Q Q Q Q. The arithmetic path becomes 1.6, 1.2, 1.4, 1.6, 1.8 and 2.0 Wh. Its final value matches the first plan, but the second boundary has already broken the reserve requirement. Later recovery does not repair that earlier violation. Values after the violation are a counterfactual accounting trace, not a claim that hardware would keep operating normally. Equal activity counts and equal final energy can conceal very different admissibility.
Read & understand
A full battery cannot bank unlimited surplus
Consider a third ordering, Q Q Q Q A A. The first two quiet orbits raise storage to 2.2 and 2.4 Wh. Each of the next two would add 0.2 Wh, but storage is full, so those increments are spilled in this simplified accounting. The two active intervals then leave 2.0 and 1.6 Wh. The plan meets the boundary reserve, but finishes 0.4 Wh below the first schedule despite having exactly the same numbers of quiet and active slots.
Track spill explicitly to preserve conservation: final storage equals starting storage plus total harvest minus total consumption minus discarded energy. Here that is 2.0 + 5.4 − 5.4 − 0.4 = 1.6 Wh. Omitting the discarded term would invent energy the battery never retained. In a changed four-slot example, a tighter capacity can even turn an otherwise acceptable sequence into one that ends below reserve. Capacity and reserve are different constraints, and neither can be replaced by an average mode cost.
The same mode counts can fail earlier
Original six-orbit model: 0.9 Wh usable harvest, Q cost 0.7 Wh, A cost 1.3 Wh, initial 2.0 Wh, reserve 1.6 Wh and capacity 2.4 Wh. Lines join modeled boundaries, not measured continuous-time battery behavior. The failing path after its violation is counterfactual arithmetic.
Open full-size diagram in a new tab: The same mode counts can fail earlierCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
State what the accounting leaves out
Our recurrence checks a net balance at orbit boundaries. It does not resolve charging and consumption within an orbit. A real spacecraft could encounter an eclipse-time low point or a peak-current limit even when these boundary values pass. Changing sunlight, attitude, charging behavior and battery health can also change the available energy. Those effects would need a richer model and applicable measurements. Passing our six numbers establishes only the stated classroom condition.
A useful plan records its horizon, starting storage, usable harvest, whole-mode costs, capacity and required reserve. If one input changes, recompute the path rather than merely relabeling the previous result. Exhaustively checking all 64 six-slot Q/A sequences is practical for this tiny example and provides a direct check on the two-active-slot maximum. Larger planning problems need more efficient methods, but still require explicit constraints and a clear account of what the result does and does not guarantee.
Read & understand
Deployment begins a different phase of work
Maya-5 and Maya-6 traveled to the station in June 2023 and were deployed from Kibo on July 19. The team credits UNISEC and JAXA for the university/deployment pathway, and NASA’s station operations record independently records the July deployment. Transport to the station and release into orbit are different milestones. Neither event alone proves that all later experiments completed their objectives or that a particular schedule was flown.
The university connection matters beyond those dates: students must connect a proposed activity to the spacecraft resources and evidence it requires. In our model, that means distinguishing a count bound, a feasible ordered plan and continuous-time operating behavior that remains unmodeled. The following lesson examines an even shorter timescale. A current monitor can observe a troubling condition, yet the time between samples and the delay before a switch opens can determine how late its response arrives.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Maya-3 and Maya-4 high-level specificationsHistorical design document, especially GPS fields on page 20 and power/protection on pages 10–12. Synthetic bytes and all classroom energy/timing values are distinguished from actual telemetry and hardware qualification.
- Read: Maya-5 and Maya-6: the Filipino J-Cube experienceSeptember 21, 2024 presentation by the second STeP-UP cohort. It supports hardware heritage, subsystem roles and the UNISEC/JAXA deployment pathway; objectives alone do not establish completed payload results.
- Read: NASA station report: July 19, 2023 deploymentDated station operations record of J-SSOD-26 deployment of Maya-5/6 on July 19, 2023. Deployment is distinct from cargo launch and later payload outcomes.