Lesson 3 of 4 · Commission a connected spacecraft
Commission a connected spacecraft
6 minute lesson · 3 checks along the way
Your goal for this lessonUse component and end-to-end tests to investigate a shared spacecraft data path.
In this lesson 3 sections · 3 checks
Read & understand
A working platform can have an unfinished payload
Commissioning is the process of checking and preparing systems for their intended operations after launch. A spacecraft may report healthy battery voltage while its mission payload cannot deliver useful data. Platform housekeeping, payload measurements and ground-product delivery involve overlapping but different paths. A successful result in one path does not automatically qualify the others.
SANSA’s 2023/24 annual report states that issues with an onboard communication bus prevented completion of MDASat payload commissioning. It also reports delays in investigation after loss of personnel. That dated account qualifies the earlier launch publicity. It does not provide a complete failure analysis or establish that every subsystem stopped working.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Localize the missing data
Imagine a bench test in which a payload produces a known packet, the onboard computer receives it, the downlink transmits it and ground software decodes it. Give the test packet an identifier and inspect it at each boundary. If it leaves the payload but never reaches the computer, investigate the intervening interface and both endpoints. Possible causes include timing, configuration, software and hardware; the observation alone does not select one.
An onboard communication bus carries data between components. It is different from the radio link between spacecraft and ground. A fault in the internal path can prevent useful payload delivery even if a separate housekeeping beacon remains audible. In the invented test, bypassing one interface with a simulator may narrow the problem, but the complete path must later be tested again with the real components.
Inspect the data at each boundary
Original teaching diagram. Conceptual test chain, not a detailed MDASat wiring diagram.
Open full-size diagram in a new tab: Inspect the data at each boundaryCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Repair one fault without hiding another
CPUT’s January 2022 update described one spacecraft starting in fail-safe mode and recovering after a requested reset. That early event should not be silently equated with the later bus issue. Similar words such as “communication problem” can describe different incidents, components and times. A recovery action needs a recorded symptom, configuration and result.
Suppose new software restores packet transfer. Repeat the failing case, then run representative valid cases and error cases. Confirm that timestamps, packet identifiers and content survive delivery. Check restart behavior as well as steady operation. A test that merely makes an error message disappear could still discard measurements. Keep a recoverable known-good configuration when evaluating an update, subject to the actual spacecraft’s capabilities.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.