Lesson 1 of 4 · Mauritius, KiboCUBE and mission milestones
Separate access from operation
8 minute lesson · 3 checks along the way
Your goal for this lessonTrace MIR-SAT1’s access to orbit while distinguishing selection, launch, deployment and received signals.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A national project within a shared opportunity
MIR-SAT1, the Mauritius Imagery and Radiocommunication Satellite 1, was led by the Mauritius Research and Innovation Council, MRIC. The council’s account describes selection through the UNOOSA–JAXA KiboCUBE opportunity in 2018 and collaboration with AAC-Clyde Space in the United Kingdom. The project combined a Mauritian engineering effort with access and expertise supplied through international cooperation.
KiboCUBE selection and spacecraft development are related but distinct. A selected proposal still needs a completed spacecraft, suitable integration and test evidence, and an agreed path to deployment. A program providing access to orbit does not automatically perform every national team’s later operating and educational task. The project must connect those responsibilities into a working mission.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep the launch and deployment dates separate
MRIC records the spacecraft’s launch aboard SpaceX CRS-22 on 3 June 2021. JAXA independently records its deployment from Kibo on 22 June. Between those events, the CubeSat traveled as cargo associated with the station rather than already operating as a separately released spacecraft. The NASA photograph shows the CRS-22 launch that began that journey.
The operator also reports first signals after deployment and reception by the MRIC control room. Those are important communications milestones. A first signal does not by itself establish a complete image downlink, successful inter-island message delivery or a validated environmental product. Each later capability needs evidence matched to what it claims.
Access to orbit has distinct milestones
The course photograph shows the carrier launch, not deployment or a later imaging result.
Open full-size diagram in a new tab: Access to orbit has distinct milestonesFalcon 9 lifts off carrying the CRS-22 Dragon cargo mission on 3 June 2021. MIR-SAT1 traveled to the ISS on this flight. The launch image shows the carrier’s ascent, not the CubeSat’s separate release from Kibo on 22 June or a verified imaging result.
Look closely
Which stage of MIR-SAT1’s journey does this photograph document?
See what to notice
It shows the CRS-22 carrier’s powered ascent on 3 June 2021. The CubeSat’s release from Kibo on 22 June and subsequent payload results require their own records.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Read a project page as a dated record
The reviewed MRIC page includes both prospective descriptions and accounts of completed 2021 events. Preserve which statements describe intentions and which describe observed milestones. The page is useful for reconstructing the mission, but its present-tense wording should not be treated as a live status monitor for the satellite.
In an original fictional ledger, proposal selection, delivery to a launch partner, carrier ascent, CubeSat release and first decoded telemetry occupy separate rows. That structure helps a reader locate a missing step without erasing the progress already documented. It also prevents a photograph of one event from standing in for an entirely different result.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: MRIC: MIR-SAT1 and its ground segmentPrimary project account covering KiboCUBE selection, development partners, carrier launch, deployment, first signals, two payloads and ground-system roles. Historical wording is not evidence of current operation.
- Read: JAXA: MIR-SAT1 deployed from KiboDeployment-provider confirmation of the 22 June 2021 release and the 1U mission’s imaging and inter-island communications demonstration purposes.