Lesson 3 of 6 · Munal and student engineering
Munal: test the spacecraft and learn from the outcome
8 minute lesson · 3 checks along the way
Your goal for this lessonEvaluate an onboard image-selection rule while separating engineering achievement from orbital success.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Words with a dotted underline open a short definition right here in the lesson.
Read & understand
Students work through a complete design
Munal was a one-unit CubeSat project involving high-school students with APN and the Nepal Academy of Science and Technology. The team’s 2023 presentation described an in-house electrical design, imaging, a combined computing-and-radio experiment, and an art-and-culture contribution. Its proposed image-selection software illustrates a practical problem: a spacecraft may acquire more observations than it can afford to transmit.
ISRO’s PSLV-C62 brochure lists Munal among the co-passenger payloads. The rocket launched on 12 January 2026, but the mission failed; ISRO reported an anomaly at the end of the third stage, and India’s Department of Space later confirmed the failure review. Munal did not reach its intended orbit. The cited evidence does not identify the students’ satellite as the cause. Preflight test results remain engineering evidence, while planned orbital measurements must not be presented as achieved results.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Choose what to transmit without hiding mistakes
Consider an invented image-selection test containing one hundred labeled pictures: sixty useful scenes and forty unusable scenes. A classifier keeps fifty-four useful scenes and six unusable ones. Sixty pictures are selected, of which fifty-four are useful, so selection is ninety percent. Six useful scenes were also lost. A single success percentage cannot tell the whole story.
If the selected pictures have equal file sizes, transmitting sixty rather than one hundred reduces this test’s image-data load by forty percent. That saving must be weighed against the missed useful observations. Labels, representative test conditions and a separate evaluation set matter: a rule tuned and judged on the same familiar pictures may look better than it performs on new clouds, lighting or landscapes.
Audit the images that are kept and those that are lost
Original teaching diagram. INVENTED 100-IMAGE TEST. 60 useful; 40 unusable. Keep 54 useful + 6 unusable. SELECTED SET. 54 / 60 = 90% useful. 6 useful scenes were missed. Selection quality and data reduction answer different questions.
Open full-size diagram in a new tab: Audit the images that are kept and those that are lostCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Preserve evidence across a difficult mission outcome
A team can retain design files, ground test records, software and the reasoning behind component choices after a launch failure. Those materials can support another mission, but only if the configuration is clear. A laboratory image classifier working on recorded scenes has passed a particular ground test; it has not thereby demonstrated reliable operation through radiation, temperature changes and real orbital viewing conditions.
For a follow-on design, write the requirement in measurable terms: how many useful scenes may be missed, what data reduction is needed, and how an operator can detect unexpected behavior. Keeping a small sample of rejected images could help diagnose bias, at the cost of additional downlink data. This is an example design option, not a claim about Munal’s implemented flight software. Learning from a mission includes being precise about what the evidence can and cannot establish.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Eliza Sapkota: Nepal’s satellite projectsJuly 2023 project-team slides describe Munal, the Thai Danfe collaboration and the separate PHI-1 payload. Old launch forecasts are not outcomes; the Aalto-1 illustration is explicitly a reference picture.
- Read: ISRO: PSLV-C62 co-passenger brochureMunal is listed as a Nepal technology-demonstration co-passenger. This preflight brochure must be read with the subsequent launch outcome.
- Read: ISRO: PSLV launch chronologyRecords PSLV-C62 on 12 January 2026; the mission page reports an anomaly at the end of the third stage.
- Read: India Department of Space: PSLV-C62 failure reviewThe 1 April 2026 parliamentary answer explicitly identifies the C62 failure and review committee. It does not assign fault to Munal’s student-built payload.