Lesson 2 of 4 · Trace an onboard science request through resource-aware planning, command execution and independent protection.
Repair an autonomous observation plan
8 minute lesson · 3 checks along the way
Your goal for this lessonTrace an onboard science request through resource-aware planning, command execution and independent protection.
In this lesson 3 sections · 3 checks
Read & understand
Give a science finding a route to action
Earth Observing-1 tested imaging technologies and later hosted the Space Technology 6 Autonomous Sciencecraft Experiment. NASA Goddard, JPL and partners combined onboard image analysis, planning and command execution. An analysis could identify a candidate event and request another observation. The request still had to fit the spacecraft’s capabilities and current state.
The published architecture separates CASPER’s activity planning from the Spacecraft Command Language executive that expands activities into commands. Lower-level flight software retains independent fault protection. A useful decision therefore has several stages: identify a candidate, propose an observation, build a feasible plan, execute it and check what actually happened. A detected feature is not itself a completed follow-up measurement.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Repair a fictional power conflict
Imagine a spacecraft with a 300-watt operating limit and an 80-watt base load. An observation needs another 180 watts for eight minutes, and a transmission needs another 160 watts for five minutes. Both loads are additional to the base load. Observation alone draws 260 watts; transmission alone draws 240 watts. Overlapping them draws 420 watts and violates the limit.
Assume both activities can occur anywhere in a 15-minute window, switching takes no time, energy and storage are adequate, and no other constraints apply. Running them sequentially takes 13 minutes and fits. If the common window shrinks to 12 minutes, the same repair no longer works. One activity must be deferred or changed through an allowed plan; an interesting detection does not create extra power or time.
Repair the overlapping power load
Original worked example using the lesson’s fictional quantities and stated assumptions.
Open full-size diagram in a new tab: Repair the overlapping power loadCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Close the loop with observed execution
The EO-1 paper describes replanning as conflicts are found in resource use or spacecraft state. A plan may need another repair when execution takes longer than expected. The executive and flight protection respond on shorter timescales than the planner. Independent checks matter because a valid plan can still meet an unexpected physical condition.
The teaching loads and windows above are fictional. Real observation opportunities depend on orbit geometry, pointing, instrument setup and communications availability. Retain the science-analysis result, the requested activity, the selected plan and execution telemetry. Those records distinguish an incorrect detection, a resource conflict and a command that failed to produce the intended observation.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Chien and colleagues: autonomous operations on EO-1Journal of Aerospace Computing, Information, and Communication 2 (April 2005), printed pages 199 and 203: planning, execution and independent flight protection; power-conflict repair. Exercise loads and durations are fictional.
- Read: NASA: EO-1’s technology legacyMarch 16, 2017 retrospective on ALI, Hyperion and autonomous follow-up observations. Future tense and reentry estimates belong to that publication date.