Lesson 3 of 4 · Unique spectrum and spatial reuse
Count reuse without creating spectrum
18 minute lesson · 3 checks along the way
Your goal for this lessonCompare unique spectrum, per-beam bandwidth and ideal aggregate rate for declared reuse patterns.
In this lesson 3 sections · 3 checks
Read & understand
Define the frequency budget once
Give the fictional system 60 MHz of unique spectrum in one polarization. With two equal channels, each channel occupies 30 MHz. The four-cycle assignment lets A and C use one 30 MHz band while B and D use the other. Across the four beams there are four uses of a 30 MHz band, but the union of occupied frequencies is still only 60 MHz.
For this illustrative calculation, assume every beam achieves a payload spectral efficiency of 2 bit/s/Hz, all four beams transmit continuously, and there are no additional shared power or gateway limits. Each beam then carries 30×2=60 Mbps, for an aggregate 240 Mbps across separate served regions. This is four simultaneous beam rates added together, not 240 Mbps promised to one terminal and not a measurement of Nusantara capacity.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Compare channel separation under the same assumptions
The added diagonal requires three channels in our conflict model. Divide the same 60 MHz into three bands of 20 MHz. Each of the four beams then has an ideal rate of 20×2=40 Mbps, giving 160 Mbps in aggregate. One channel is reused by B and D; the other two are each used once. Nothing has increased the unique 60 MHz frequency budget.
If each beam instead receives a different channel, four equal bands provide 15 MHz per beam and 30 Mbps per beam, or 120 Mbps in aggregate. The two-, three- and four-channel cases therefore produce ideal totals of 240, 160 and 120 Mbps under the declared assumptions. The factor four divided by the channel count describes the average number of beam uses per band in these examples. It is not a universal multiplier for actual satellite throughput.
Reuse a band, not the spectrum budget
Original fictional model: four continuously active beams each use one band in one polarization. Frequency bars share one scale; rates exclude additional power, gateway and demand limits.
Open full-size diagram in a new tab: Reuse a band, not the spectrum budgetRead diagram data as a table
| Bands | MHz per beam | Aggregate Mbps |
|---|---|---|
| 2 | 30 | 240 |
| 3 | 20 | 160 |
| 4 | 15 | 120 |
Original fictional model: four continuously active beams each use one band in one polarization. Frequency bars share one scale; rates exclude additional power, gateway and demand limits.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Do not optimize one number while changing its assumptions
The apparent advantage of fewer channels depends on maintaining the assumed spectral efficiency. If reuse causes interference that forces a different coding and modulation choice, the 2 bit/s/Hz assumption may no longer hold. Ground links, power allocation and traffic demand can impose further restrictions. Boeing’s description of a flexible payload motivates studying such choices; it does not validate our equal-band plan or fixed efficiency.
Compare complete scenarios. Record the unique spectrum, channel partition, active beams, assumed payload efficiency and any excluded constraints beside the calculated total. Reusing a band is useful only if the intended receivers can still obtain the required service. The final lesson checks a specific weakness of our simplified graph: several individually tolerable interferers can become unacceptable when their powers add.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Boeing: Nusantara Lima delivery, August 2025Manufacturer role, 702MP platform and flexible payload-processing context. Later launch/service claims in this release are forecasts; no numerical teaching model comes from spacecraft settings.
- Read: ESA: capacity enhancement and interference managementSpatial frequency reuse can improve aggregate capacity while requiring interference control. Completed research study is methodological context, not a Nusantara system description or guarantee of real throughput.