Your goal for this lessonSeparate launch, orbit arrival, service commissioning and future constellation specifications in QZSS history.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Use different evidence for different milestones
The photograph shows Michibiki-7 during its December 1, 2025 presentation at Mitsubishi Electric’s Kamakura Works. It documents physical hardware on the ground. JAXA later confirmed its launch on H3 Flight 9 at 04:23:31 JST on August 11, 2026, equivalent to 19:23:31 UTC on August 10. The two calendar dates describe one event in different time zones.
The Cabinet Office confirmed arrival at the intended orbital position on August 22 and said functional checks of the service equipment would follow. A photograph, a launch result and an orbit-arrival notice establish different things. None should be silently relabeled as evidence that every service was commissioned. The chronology here was reviewed on October 24, 2026; it is a dated learning record, not a live availability display.
Michibiki-7 at its December 1, 2025 media presentation. A ground photograph documents hardware, not a commissioned service or a user’s positioning accuracy. Full source frame retained; Atlas delivery copies resized and compressed.
Look closely
Does the visible flight hardware prove that a navigation service was operational on the photograph’s date?
See what to notice
No. This is a ground presentation. Launch, orbit arrival, testing and service commissioning require their own dated evidence.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Follow commissioning service by service
Michibiki-6, or QZS-6, launched on February 2, 2025. Its July 18 notice confirms the start of positioning and MADOCA-PPP services, while identifying ionospheric correction transmission as experimental and other functions as scheduled. A separate notice confirms SBAS transmission beginning October 2, 2025. One spacecraft therefore has several service milestones with different evidence states.
In a teaching ledger, give each row a spacecraft, a function, a date and a status such as planned, experimental or operational. That makes it possible to connect QZSS with the earlier MTSAT augmentation service without saying every QZSS function is an aviation service. It also prevents a future tense in one announcement from becoming a completed event merely because time has passed.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep expansion plans attached to their assumptions
The July 2026 six-satellite supplement accounts for the loss of QZS-5 and describes the intended configuration using QZS-2, QZS-3, QZS-4, QZS-1R, QZS-6 and QZS-7. It specifies differences from the seven-satellite performance standard and planned orbit adjustments. The associated notice places this configuration after QZS-7 begins operations. A documented future configuration is not itself a commissioning announcement.
The standards page also identifies which provisions apply only after the seven-satellite service starts. Read the scope, version, service area and assumptions before applying a number. A value for seeing one satellite is not a guarantee of a complete position solution, and an average performance measure is not a worst-case guarantee. Use dated service notices for milestones and operating notices for current conditions; keep plans, tested results and commitments distinct.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Cabinet Office: QZS-6 service start, July 18, 2025
- Read: Cabinet Office: QZS-6 SBAS start, October 2, 2025
- Read: JAXA: QZS-7 launch result, August 11, 2026
- Read: Cabinet Office: QZS-7 reached its operating position, August 22, 2026
- Read: Cabinet Office: six-satellite transition information, July 2026
- Read: Cabinet Office: standards, applicability dates and service versions
- Read: Cabinet Office: Michibiki-7 photographic record
- Read: Cabinet Office: QZSS satellite properties and operational-history records