Lesson 1 of 3 · Noisy references, regression attenuation and relative calibration
Keep the reference's uncertainty
25 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish prediction from physical calibration when both records have error, then recover a relative gain using a third record.
In this lesson 4 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Compare measurements, not just spacecraft
Sentinel-6, also called Jason-CS, continues the reference ocean-altimetry family. Michael Freilich launched in November 2020; Sentinel-6B launched on 17 November 2025 UTC, still 16 November in California. Poseidon-4 supports conventional low-resolution and synthetic-aperture processing simultaneously. Its products include significant wave height, a measure of sea state distinct from mean sea-surface height or the tallest individual crest. This course studies how such records can be compared, using invented numbers rather than mission observations.
The European–US partnership combines Copernicus, ESA, EUMETSAT, NASA and NOAA, with CNES technical support from France. Sentinel-6B was built in Friedrichshafen, Germany; its propulsion was developed and tested in Stevenage, UK. The first signal reached ESA through Inuvik in Canada. EUMETSAT took control in Darmstadt on 20 November 2025. These roles explain the country links. The photograph belongs to Michael Freilich during earlier preparation; neither its appearance nor the later launch establishes calibration accuracy.
Sentinel-6 Michael Freilich during encapsulation at Vandenberg on 3 November 2020. This complete prelaunch photograph shows the first Sentinel-6 spacecraft, not Sentinel-6B or an ocean measurement.
Look closely
Which spacecraft does this photograph document, and what does it leave untested?
See what to notice
It shows Michael Freilich during prelaunch preparation. Calibrated ocean comparisons need observations and an error model; neither the photograph nor a successful launch demonstrates those results.
Read & understand
Give the reference an error term
Let T be an unknown common wave-height quantity on a stipulated reference scale, in metres. Invent three measurements: X=T+eX, Y=0.4 m+1.2T+eY and Z=T+eZ. The gain 1.2 is dimensionless. Set the population mean of T to 3 m and its variance to 1 m². Each error has mean zero, is uncorrelated with T and is uncorrelated with the other errors. Their standard deviations are 0.5, 0.2 and 0.3 m respectively. These exact population assumptions describe our model, not three named instruments.
Write Cxy for covariance: the average product of deviations from the two means. The shared T gives Cxy=1.2 m², while independent error increases Cxx=Var(X) to 1+0.25=1.25 m². Similarly Cyy=1.2²+0.2²=1.48 m². A noisy reference spreads points sideways in an X-versus-Y comparison. Calling X a reference fixes our scale and zero; it does not remove its random uncertainty. An externally unknown common gain or offset cannot be discovered merely by naming a reference. The population least-squares prediction slope is Cxy/Cxx; its intercept makes the line pass through the two means.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A prediction line has a different job
The ordinary least-squares line predicting Y from observed X has population slope m=Cxy/Cxx=1.2/1.25=0.96. Its intercept is mean(Y)−m mean(X)=4−0.96×3=1.12 m. The physical gain specified in the model was 1.2, not 0.96. Sideways noise has reduced the fitted slope. This does not make the fit useless: it minimizes mean squared vertical prediction residual among affine lines under these moments. It answers a different question from recovering the instrument relationship to T.
Reversing the fit does not repair the problem. The X-on-Y slope is Cxy/Cyy=30/37; turning that line around gives slope 37/30≈1.233, also different from 1.2. If an independent source supplied the exact X error variance 0.25 m², then Cxy/(Cxx−0.25)=1.2. That correction depends on knowing the error variance and its relationship to the signal. Subtracting a guessed noise value can manufacture a desired slope, especially when the remaining signal variance is small.
A noisy reference flattens the fit
Original equal-weight factorial example: T is 2 or 4 m, X error is ±0.5 m, and Y error is ±0.2 m. The gold line depicts ideal calibration with noiseless X=T; the pink line predicts Y from observed noisy X. These are invented values, not Sentinel-6 observations.
Open full-size diagram in a new tab: A noisy reference flattens the fitCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Use a third record with explicit assumptions
Our third system supplies Cxz=1 m² and Cyz=1.2 m². Their ratio Cyz/Cxz=1.2 recovers Y’s gain relative to X without putting X’s own noise variance into the denominator. The recovered offset is mean(Y)−1.2 mean(X)=0.4 m. If Z instead had an unknown nonzero gain g, the two covariances would both include g and it would cancel. This requires a nonzero shared signal and the stated absence of cross-correlated errors; a third file alone supplies no guarantee.
For an alternate experiment, increase X’s error standard deviation from 0.5 to 1 m. Its variance becomes 2 m² and the prediction slope becomes 0.6, while the covariance-ratio gain remains 1.2 under the same independence assumptions. If X is noiseless, both slopes become 1.2. Actual samples estimate these population moments imperfectly. Inspect the sampled range, dependence, outliers and calibration period before interpreting a ratio. The next lesson asks what the three-way comparison can reveal about noise, and what shared errors can hide.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA: Sentinel-6B science and spacecraftNASA identifies the spacecraft, payload and national contributions. Its future-tense launch wording is superseded here by the dated ESA launch release.
- Read: ESA: Sentinel-6B launched to extend record of sea-level riseThe 17 November 2025 release confirms the UTC/CET launch date and first contact through Inuvik; it is not proof of later validated science performance.
- Read: Copernicus Sentinel Online: Sentinel-6 instrument payloadInstrument context for simultaneous low-resolution and SAR processing. Design promises are not treated as measured absence of bias.
- Read: UK Space Agency: New satellite to monitor sea-level rise from spaceThe 14 November 2025 release identifies the propulsion work in Stevenage; its launch and tandem plans remain historical expectations.
- Read: EUMETSAT takes control of Copernicus Sentinel-6BThe 20 November 2025 account establishes the handoff to EUMETSAT in Darmstadt. Later planned milestones are not asserted as completed.
- Read: Vogelzang and Stoffelen: Triple collocation, NWPSAF-KN-TR-021, version 1.0Version 1.0 is dated 6 July 2012. PDF pages 7–9 develop the general error model; the regression examples, values and derivations here are original.