Lesson 2 of 4 · Approach, clearance and connection
Approach, clearance and connection
5 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish rendezvous evidence from docking readiness and explain the role of clearance.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Practice an approach before making a connection
STS-63 brought Discovery close to Mir in February 1995 without docking. That rendezvous was useful work: crews and controllers gained experience with a joint approach. A mission does not have to complete every later objective to provide evidence for the stage it was designed to test.
The first shuttle docking came with Atlantis on STS-71 later in 1995. Treating the earlier close approach as a docking would erase a meaningful development step. A timeline should describe what happened, not promote every encounter into the next milestone.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A large visitor needs room
Mir had modules and solar arrays extending around its docking locations. The docking module delivered on STS-74 provided clearance for shuttle visits. A connector may match mechanically while the surrounding vehicle geometry still creates a collision risk.
Imagine a proposed approach corridor with a 12-meter usable width and a vehicle envelope 10 meters wide. Centered perfectly, that leaves one meter on each side, not two. This classroom geometry is not a Mir clearance specification: actual analysis must include orientation, flexible structures, uncertainty and motion.
The STS-74 and Mir-20 crews pose inside Mir after Atlantis docked in November 1995. NASA image S74E5117 documents the people together inside the station; it does not show the external docking interface. Display image resized and compressed.
Look closely
What does a group portrait inside Mir establish, and what does it leave unseen?
See what to notice
It documents the visiting and resident crews together. External clearance, docking loads and seal tests need other evidence.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Verify the operation, not just a drawing
A static model shows nominal positions. Flight operations require controllers to monitor the changing approach, maintain communication and respond when conditions fall outside limits. An accurate drawing is an input to planning, not proof that a real maneuver was completed safely.
The sequence from approach to docking and cargo transfer combines different kinds of evidence. Images can document configuration; telemetry and operational records help establish motion and checks; the transfer record shows what moved. Keeping these distinct makes the program’s progress easier to understand.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.