Lesson 4 of 4 · Move from demonstration to repeatable service
Move from demonstration to repeatable service
6 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish development completion, technology transfer and demonstrated operational service.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Record the later flight outcomes
SSLV-D2 successfully delivered its three payloads in February 2023 after the D1 corrective work. SSLV-D3 launched successfully on August 16, 2024 with EOS-08, and ISRO described that flight as completion of the development project. The August 8 heading on the D3 page is not the launch date; the outcome text supplies August 16.
The photograph in this lesson shows D1 in 2022. It must not be relabeled as D2 or D3 because later flights succeeded. An image can illustrate the vehicle’s appearance while its caption preserves the actual flight and its outcome.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Transfer a capability, not just a drawing
ISRO reports a September 10, 2025 technology-transfer agreement among ISRO, NSIL, IN-SPACe and Hindustan Aeronautics Limited. That is an institutional milestone toward industrial production and launch services. An April 2026 Department of Space reply also described SSLV’s completed development and handover. These are dated records, not a guarantee of a particular later launch cadence.
A repeatable service needs controlled manufacturing, configuration records, trained operations, acceptance testing and handling of changes. A transferred design can still need evidence that each produced article meets requirements. The signature on an agreement and the acceptance record for a flight vehicle establish different things.
ChinmayAlpe’s photograph of SSLV-D1 on August 7, 2022. The later mission outcome was unsuccessful orbital delivery; this is not D2 or D3. CC BY 4.0; full preserved frame, resized and compressed.
Look closely
Can the normal-looking ascent prove successful final orbit delivery?
See what to notice
No. It records an early visible phase; later navigation and injection conditions determine the delivery outcome.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Choose useful service measures
In an original service review, one team reports its shortest integration time; another reports the range across twenty missions and explains which delays were included. The second account is more useful for a customer assessing variability. A best case can be real while remaining unrepresentative of ordinary delivery.
Useful measures connect the service promise to outcomes: schedule adherence under defined conditions, orbit-delivery accuracy, accommodation changes and the handling of anomalies. State the sample and reporting period. Do not infer an indefinite future success rate or an on-demand guarantee from a small development-flight sample.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.