Lesson 1 of 4 · Keep the design version, test article and demonstrated result together.
Read a dated vehicle baseline
8 minute lesson · 3 checks along the way
Your goal for this lessonKeep the design version, test article and demonstrated result together.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A program name can outlast a design
Taiwan’s orbital-launch development is a program with changing designs and successive tests. TASA’s September 2023 exhibition announcement describes a three-stage model. Its mission page reviewed on November 4, 2026 instead presents a two-stage liquid-propellant design. Those descriptions belong to different stages of development. A display model is evidence of a proposed arrangement, not a flight result.
A baseline identifies the version being discussed: the requirements, design and supporting documents used for a decision. When comparing sources, label their dates and the object each describes. Do not attach the stage count of an earlier exhibit to the performance target of a later design and call the combination the current vehicle.
Keep each design with its date
Original configuration comparison based on TASA descriptions; shapes are not vehicle blueprints.
Open full-size diagram in a new tab: Keep each design with its dateCheck 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Read a test photograph with its configuration record
The Vanguard TV-2 record provides a historical comparison. The U.S. Navy photograph shows a vehicle rising above its pad in October 1957. NASA’s retrospective describes an active first stage and dummy upper stages in that test. The assembled outline therefore does not mean every stage was operating or that a satellite was being placed in orbit.
This is not a photograph of MARAHO or Taiwan’s proposed launcher. Its teaching value is the difference between visible shape and documented configuration. A test article can resemble an operational vehicle while using substitute equipment. The record of what was installed and active determines which claims a test can support.
Vanguard TV-2 launching at Cape Canaveral in October 1957 with dummy upper stages. This U.S. historical test comparison is not MARAHO or Taiwan’s orbital vehicle. The complete source scan is retained; internal equipment cannot be identified from appearance alone.
Look closely
What can the visible ascent show, and which configuration details require the record?
See what to notice
The vehicle, plume and pad show ascent. The documented dummy upper stages cannot be established from the outer shape alone; the photograph does not show orbital insertion or Taiwan hardware.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Carry evidence forward carefully
In an original fictional exercise, a telemetry package passes a test as version A. The team later changes its message format and receiver software to version B. The earlier result remains part of the history, but it does not automatically verify the new connection. Identify the change, assess the affected requirements and gather the evidence needed for version B.
NASA’s configuration-management guidance supports keeping a product and its documentation consistent through changes. Here that is a general engineering principle, not a statement that Taiwan follows every NASA procedure. A useful evidence note names the tested version, conditions, result and limits so that later readers can judge whether it applies.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: TASA: current launch-vehicle baselineCurrent specification and structure tabs reviewed November 4, 2026; targets remain distinct from demonstrated performance.
- Read: TASA: September 2023 three-stage model exhibitionOriginal-language account of the September 2023 three-stage exhibit model, not a completed flight.
- Read: NASA: configuration managementGeneral guidance on configuration identity and controlled change; not a statement of TASA procedures.
- Read: NASA: 1968 launch-vehicle retrospectiveLaunch Vehicles section, page 3 (PDF page 95), describes the October 1957 test with dummy upper stages.