Lesson 4 of 4 · Delivery boundaries and reproducibility
Test the delivery boundary
17 minute lesson · 3 checks along the way
Your goal for this lessonEvaluate changed message size, uplink rate and missing contacts; distinguish a reproducible model result from operational delivery.
In this lesson 3 sections · 3 checks
Read & understand
Change message size and preserve the timetable
Reduce the message to 2 MB while keeping readiness at minute 1 and all original rates. The uplink finishes at minute 2. The early direct downlink then runs from 2 to 3, producing arrival at minute 3. A 3 MB message instead finishes uplinking at 2.5 and downlinks from 2.5 to 4, just fitting the early closing boundary.
For message sizes from 2 through 4 MB on these early contacts, the two transmissions each require L/2 minutes. With readiness at 1 and the downlink already open by the time the tested messages reach S, completion is 1 + L. Thus L = 3 is the largest message in this range that can finish by minute 4. At 3.1 MB, the proposed direct completion becomes 4.1 and misses the window. The gateway path then arrives at 8.775. A small size change can cross a contact boundary and cause a much larger delay.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Test an upgrade and a missing opportunity
Return to the 4 MB baseline and increase only the uplink rate to 4 MB/min. Starting at minute 1, it now finishes at 2. The unchanged early downlink sends the message from 2 to 4. This upgrade improves arrival from 9 to 4 by catching an opportunity that the slower uplink missed. Its benefit is not simply the one minute saved during the uplink itself.
By contrast, removing the G-to-D opportunity leaves the baseline direct route available, arriving at 12 and missing the minute-9 deadline. If source readiness moves to 1.5, the first uplink would finish at 3.5 and cannot be used. The second uplink carries the message from 6 to 8, followed by direct delivery from 10 to 12. Remove that later uplink too, and the declared table contains no feasible delivery path.
A small change can miss a window
Original fictional cases. Unless changed in the row: 4 MB, source ready at minute 1, uplink 2 MB/min, full contact table. Whole-message forwarding and inclusive closes apply. No route means no feasible path in this table.
Open full-size diagram in a new tab: A small change can miss a windowRead diagram data as a table
| Changed input from baseline | Arrival (min) | Path or cause |
|---|---|---|
| 2 MB | 3 | Early direct |
| 3 MB | 4 | Exact early boundary |
| 3.1 MB | 8.775 | Via gateway |
| Baseline: 4 MB | 9 | Via gateway |
| Uplink 4 MB/min | 4 | Early direct |
| Ready at 1.5 | 12 | Later uplink + direct |
| Ready 1.5; no late uplink | No route | First uplink misses close |
Original fictional cases. Unless changed in the row: 4 MB, source ready at minute 1, uplink 2 MB/min, full contact table. Whole-message forwarding and inclusive closes apply. No route means no feasible path in this table.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Make the handover reproducible
A sound handover includes successful cases, exact boundary cases and cases with no route. Another team should be able to reproduce minute 9 for the baseline gateway path, minute 4 after the uplink upgrade, and the missed-uplink failure without inventing an extra contact. Preserve the inputs and assumptions with each result so that a changed answer can be traced to a changed condition.
Thai-Paht’s combination of imaging and stored-message communications made integration and operation part of the learning opportunity. Our exercise develops one related habit: explain how data move through a complete system and test the boundary of the explanation. It does not measure the historical team’s competence or certify current mission performance. Practical capability needs evidence such as repeatable procedures, understood interfaces and independently checked results.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: SSTL: Thai-Paht / TMSat mission historyManufacturer history, mission payloads, training participation and completed launch date; not the incorrect country label.
- Read: NASA: modern delay/disruption-tolerant networking comparisonGeneral modern store-and-forward explanation and multiple-path concept only; not historical Thai-Paht protocol evidence.