Lesson 4 of 4 · Reception thresholds and single-leg deterioration
Test a stated margin
18 minute lesson · 3 checks along the way
Your goal for this lessonSolve a threshold inequality under a declared single-leg deterioration model without inferring weather probability or service availability.
In this lesson 3 sections · 3 checks
Read & understand
State what the margin is relative to
Use the upgraded case U = 100 and D = 50, whose total is 100/3. Keep the stipulated required total at 25. The end-to-end margin is 10 log₁₀((100/3)/25), about 1.25 dB. A positive value means this modeled state exceeds that particular threshold. Changing the required threshold changes the margin even if the physical state being modeled is unchanged.
Now define a deterioration factor f that divides D while leaving U fixed: D becomes 50/f, with f ≥ 1. This is a controlled sensitivity exercise. We do not identify f with an observed rainfall rate, assume a weather distribution or claim that real changes leave every other parameter fixed. Such assumptions would require additional evidence before this calculation could predict operational reception.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Find the exact boundary before rounding
The previous lesson found that D must remain at least 100/3. Substituting 50/f ≥ 100/3 gives f ≤ 3/2. At f = 1.5, the total is exactly 25 and satisfies our inclusive threshold. At f = 2, D becomes 25 and the total falls to 20, below threshold. Use the exact fractions for this decision; a rounded display of 33.33 should not silently redefine a boundary.
The permitted change to D at the boundary is 10 log₁₀(1.5), about 1.76 dB. That differs from the initial end-to-end margin of about 1.25 dB. There is no contradiction: one number describes a change to one leg, while the other compares the combined ratio with a requirement. The unchanged uplink contribution means a downlink change does not translate one-for-one into an end-to-end decibel change.
A single-leg change has a boundary
Fictional sensitivity model with U=100 fixed. The factor changes only D. The boundary comparison contains no weather probability or annual-availability estimate.
Open full-size diagram in a new tab: A single-leg change has a boundaryRead diagram data as a table
| Factor f | Downlink D=50/f | Total ratio R | R ≥ 25? |
|---|---|---|---|
| 1 | 50 | 100/3 | Yes |
| 5/4 | 40 | 200/7 | Yes |
| 3/2 | 100/3 | 25 | Yes |
| 7/4 | 200/7 | 200/9 | No |
| 2 | 25 | 20 | No |
Fictional sensitivity model with U=100 fixed. The factor changes only D. The boundary comparison contains no weather probability or annual-availability estimate.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Return to the evidence needed for a service claim
A threshold comparison for one modeled state does not give the fraction of a year during which reception succeeds. We have supplied no time history or probability distribution for f, and no model of ground power, equipment failure or content delivery. Even the threshold is fictional. To estimate an actual error rate or availability, an analyst would need appropriate receiver requirements, operating conditions and validated measurements or models.
Return to the historical Thaicom 6 footprint: a labeled coverage region and a dated payload description help identify a service opportunity, while a local link calculation asks whether a particular receiving arrangement can meet a defined requirement. Neither replaces the other. This is the useful connection between program history and engineering analysis: preserve which spacecraft and service are being discussed, then test the receiving conditions rather than treating a coverage map as a universal guarantee.
For a changed exercise, let U = 120, D = 40 and the required total be 24. The baseline total is 30, the minimum acceptable D is 30, and the maximum permitted deterioration factor is 40/30 = 4/3. The method carries across, while the answer changes with the inputs. A defensible conclusion names those inputs and the remaining uncertainties instead of treating one attractive ratio as proof of a working communications service.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: ITU-R S.1328-5: satellite-system characteristics (July 2024)Annex 2 distinguishes transparent/remodulating systems; field 9.13 on printed page 19 gives end-to-end combination and field 9.15 margin. Original exercises omit interference and do not copy the representative link budgets.
- Read: Thaicom 6/Africom 1: historical service-footprint sheetSheet marked November 2017, preserved and visually reviewed. Manufacturer, launch month and named beam regions are historical context, not a current service guarantee.