Lesson 1 of 4 · Mission and operational evidence
Separate launch from useful service
15 minute lesson · 3 checks along the way
Your goal for this lessonTrace the main spacecraft, operational handover and users without confusing separate missions or evidence stages.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A spacecraft within a national information system
THEOS-2 launched on a Vega rocket from French Guiana on October 9, 2023. Airbus built the main satellite for Thailand’s Geo-Informatics and Space Technology Development Agency, GISTDA. The manufacturer’s launch account places it within a broader geo-information system that also draws on other optical and radar observations. A spacecraft supplies measurements; the surrounding system makes those measurements available for decisions.
The same programme includes a separate SSTL small-satellite and engineering-training component, THEOS-2A. Shared programme management does not give the two spacecraft a shared flight history. This course follows the main THEOS-2 mission and its mapping products. Keep each spacecraft’s launch, commissioning and results attached to its own identity.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Follow the evidence beyond launch
GISTDA’s April 2025 retrospective records handover of the main system and release of its first high-resolution imagery in May 2024. It describes imagery supporting responses to Thai floods and forest fires during 2024. This provides evidence of applications beyond the launch milestone. The account’s intended future applications remain plans at the date of that account; their mention is not proof of a later outcome.
Imagine a project report with three folders: launch evidence, accepted image products and a completed flood-response decision. Each folder answers a different question. A successful launch does not independently prove product quality, and a delivered image does not prove that a particular intervention worked. Operators, processing specialists and application teams contribute different links in the chain. Identify the link you need before accepting a broad success claim.
Keep mission evidence stages distinct
Source-based milestone guide with an original evidence framework. The final stage is a question for users, not a claim that a particular policy outcome occurred.
Open full-size diagram in a new tab: Keep mission evidence stages distinctRead diagram data as a table
| Stage | Date or condition | Evidence scope |
|---|---|---|
| Launch | October 9, 2023 | A spacecraft reaches its flight milestone. |
| Handover and first imagery | May 2024 | Operator account records supplied imagery. |
| Application evidence | Reported April 2025 | GISTDA describes 2024 flood/fire support. |
| A particular decision | Needs its own record | A delivered image alone proves no outcome. |
Source-based milestone guide with an original evidence framework. The final stage is a question for users, not a claim that a particular policy outcome occurred.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Order the product that answers the question
GISTDA’s service page distinguishes archived imagery, new tasking and prepared basemap products. An archive request asks what already exists. Tasking asks whether new observations can meet a need. A basemap is a processed product with its own dates and preparation history. These categories help a user formulate a request; they do not promise that every place has suitable recent cloud-free coverage.
The user guide still contains prelaunch wording about a planned 2023 launch. Read it for the specified instrument and product definitions, and use later mission accounts for achieved milestones. The rest of this course follows a fictional mapping team that needs a feature’s location, an observation within a deadline and evidence that the delivered map meets a requirement. Its numerical exercises are original teaching examples, not recovered THEOS-2 performance data.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Airbus: THEOS-2 launch, October 2023Manufacturer confirms 2023 Vega launch and 2018 selection; separates main spacecraft, broader imagery access and SSTL SmallSAT. Historical predecessor-status claim stays dated.
- Read: GISTDA: THEOS-2 first-year mission account, April 2025Date performance and future-application statements to this account. Do not infer present service or final policy outcomes from intended applications.
- Read: GISTDA: THEOS-2 and THEOS-2A user guidePrelaunch wording; not current operating guarantee. Nadir 0.5 m PAN / 2 m MS; location specification better than 25 m CE90 without GCP. Do not equate sampling with position accuracy. Detector row arithmetic inconsistent. Revisit assumptions include viewing-angle limits. Level labels are specific to this system.
- Read: GISTDA: THEOS-2 products and servicesBroad 1 m accuracy wording lacks the guide’s no-GCP conditions; do not claim all products have a universal 1 m accuracy.