Lesson 4 of 4 · Configuration-bound verification
Retain evidence through interface changes
17 minute lesson · 3 checks along the way
Your goal for this lessonMatch test results to configurations and identify what must be retested after an interface change.
In this lesson 3 sections · 3 checks
Read & understand
Turn the calculation into an integration record
A reproducible record identifies the physical mounting or simulator, the frame definitions, the input source and the decoder version. For each labelled test vector, preserve the transmitted values, the interpreted output and the independently predicted result. Record whether the test injected values into software or stimulated real hardware. A synthetic input can verify a decoder without verifying that the sensor’s physical axes match its labels.
Our integer examples use exact equality. A physical test would require a justified uncertainty model and acceptance tolerance, declared before inspecting the result. Compare residuals in common units and named axes; do not treat measurement noise as a reason to ignore systematic sign or axis errors. The course supplies no flight tolerance, calibration accuracy or operational pointing requirement for Pathfinder.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A changed interface changes what old evidence covers
Imagine that a mounting change replaces the original sensor-to-body mapping with (y, −x, z). The old test report can remain an accurate record of the earlier configuration while no longer demonstrating compliance for the new one. Update the approved mapping, expected outputs and affected integration tests together. A document revision without matching software and hardware configuration records leaves the handover ambiguous.
Conversely, a change to an unrelated display label need not invalidate every physical test. Assess the actual dependency: which requirement, implementation path or measurement interpretation could change? NASA’s interface guidance treats approved interface changes as inputs to verification. The practical task is to retain the old evidence, state its applicability, and produce the additional evidence needed for the changed system.
Bind results to the tested configuration
Original fictional revision scenario, not a Pathfinder change history. Old evidence remains valid for its recorded configuration; an approved new requirement needs applicable verification.
Open full-size diagram in a new tab: Bind results to the tested configurationRead diagram data as a table
| Configuration | Declared mapping | Expected output for (1,2,3) | Evidence scope |
|---|---|---|---|
| Original | (-y, x, z) | (-2, 1, 3) | Original mounting and implementation |
| Revised | (y, -x, z) | (2, -1, 3) | Revised mounting and implementation |
Original fictional revision scenario, not a Pathfinder change history. Old evidence remains valid for its recorded configuration; an approved new requirement needs applicable verification.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Connect a bench result to the mission without overstating it
The complete exercise follows a chain from a physical convention to a mathematical mapping, then to discriminating inputs and recorded outputs. If all planned tests pass, report the tested configuration and assumptions. A simulator result does not demonstrate a radio link, a vibration environment or an orbital observation. Those claims require their own relevant evidence rather than a broader label attached to this test.
NARIT’s dated Pathfinder account describes a partnership moving through engineering development. This course uses that setting to examine a general integration problem, not to diagnose a reported Pathfinder fault. The useful habit is to ask what both teams mean by each value, which observations could expose a disagreement, and how later changes affect earlier results. A successful handover carries those definitions and limits alongside the data.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NARIT: August 2025 Pathfinder development milestonesDated August 2025 partnership, critical design review and engineering prototype; ground data system remains next-step work. No launch or orbital result inferred.
- Read: NASA: interface managementGeneral comparison: agreed interface documentation, controlled changes and integration verification. Not a TSC-Pathfinder-specific requirement.
- Read: NASA: product realization and integrationGeneral comparison: integrated testing, declared configurations, test evidence and verification versus validation.