Lesson 2 of 4 · Bands, transponders and capacity
Read the payload allocation
8 minute lesson · 3 checks along the way
Your goal for this lessonInterpret VENESAT-1’s transponder allocation without inventing customer throughput.
In this lesson 3 sections · 3 checks
Read & understand
Count channels without inventing a rate
CGWIC lists twenty-eight VENESAT-1 transponders: fourteen in C band, twelve in Ku band and two in Ka band. A transponder receives and retransmits a radio signal within its operating design. The count describes the payload allocation; it is not a measurement in megabits per second.
The three groups add to twenty-eight, and the C-band group accounts for half of that count. Neither calculation means C band supplied half of all usable data capacity. That conclusion would also require information about bandwidth, signal encoding, power allocation and how the channels were used.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Match the terminal to the service
Frequency bands describe different parts of the radio spectrum. A terminal must be compatible with the assigned service, including its frequency and signal format. A roof full of dishes does not reveal the provider, service rate or whether a return link exists. The preserved Algiers photograph is a comparison, not a Venezuelan installation.
In an original allocation exercise, a payload has ten compatible channels, each assigned 8 megabits per second under the same stated conditions. Their combined assigned rate is 80 megabits per second. This fictional example deliberately supplies a per-channel rate; the historical transponder count alone does not.
Read the transponder allocation
CGWIC payload specification. A per-channel capacity would be needed to estimate total data rate.
Open full-size diagram in a new tab: Read the transponder allocationReceiving dishes in Algiers, Algeria, from the CIA World Factbook collection. This comparison illustrates ground equipment; it does not show Venezuela, a VENESAT-1 installation or identified subscribers. A visible dish does not establish a two-way internet connection.
Look closely
Does this photograph identify a VENESAT-1 connection?
See what to notice
No. It shows receiving dishes in Algiers. The caption identifies a comparison, and the picture alone cannot identify the provider or prove a return path.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Check shared demand
Now suppose four fictional sites request 25 megabits per second simultaneously from that 80-megabit-per-second pool. Total demand is 100, leaving a 20-megabit-per-second shortfall. A planner must change the allocation, scheduling or service offer; calling the region covered does not remove the shortfall.
This arithmetic assumes that all four sites share the same bottleneck and that the entire stated pool is usable for those sites. Real planning also accounts for overhead and link conditions. Keep those assumptions visible so a classroom capacity budget is not mistaken for a VENESAT-1 operating specification.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.