Match the launcher to the service
India’s Geosynchronous Satellite Launch Vehicle program developed access to transfer orbits for communications satellites. This course follows the Mark I/II lineage and its transition from Russian-supplied to Indian cryogenic upper stages. LVM3, formerly called GSLV Mark III, has a different architecture and its own course. A similar name does not make the two launchers interchangeable.
Communications service depends on more than a successful liftoff. A satellite needs the intended orbit, reliable power, working antennas and a functioning ground system. The launcher provides a specified handoff. The spacecraft and its operators are responsible for subsequent activities defined in that mission’s plan.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Understand the transfer-orbit handoff
A geostationary transfer orbit is elliptical: its low and high points are far apart. A communications spacecraft can use its own propulsion to adjust that orbit toward its operating destination. Reaching the high point once does not establish a circular, equatorial geostationary orbit. Plane changes and circularization require their own mission planning.
Think of launch delivery as an agreed starting state, with position, velocity and uncertainties. A small difference in that state can change the spacecraft’s remaining maneuver requirements. The target is therefore not merely a location to be reached but a trajectory from which the next phase can begin.
GSAT-6 provides a concrete launch example in the photograph: GSLV-D6 carried it in 2015. Its later orbit and service are separate from the visible ascent.
GSLV-D6 launches GSAT-6 on August 27, 2015. The spacecraft remains enclosed; this is ascent context, not communications commissioning. Credit: Indian Space Research Organisation. License: CC BY-SA 4.0. Source: https://commons.wikimedia.org/wiki/File:GSLV_Mk.II_D6_lifting_off_with_GSAT-6.jpg
Look closely
Does this ascent image show GSAT-6’s final operating orbit?
See what to notice
No. Tracking and later spacecraft operations establish the orbit and service; the image records launch context.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep propulsion budgets explicit
In an invented classroom budget, a spacecraft has 1,800 metres per second of maneuver capability allocated for its planned sequence. Its simplified orbit-raising task needs 1,500 metres per second and a stated reserve is 200. The unallocated amount is 100. These are illustrative velocity-change allowances, not GSLV or GSAT specifications; real maneuver analysis accounts for changing mass and mission conditions.
If an injection error adds 150 metres per second to that task in the same simplified budget, the original reserve can no longer be maintained: 1,800 minus 1,650 minus 200 is minus 50. The mission needs a revised assessment, not a claim that the satellite is fully operational because it has separated from the rocket.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.