Lesson 2 of 4 · Interface requirements and verification
Make readiness testable
8 minute lesson · 3 checks along the way
Your goal for this lessonBuild a fictional readiness matrix that separates independent constraints and their evidence.
In this lesson 3 sections · 3 checks
Read & understand
Turn a requirement into a check
A shared deployment opportunity connects equipment built by different teams. Readiness therefore needs more than a familiar CubeSat label. In an original classroom project, the team writes each interface requirement next to a method, a tested configuration and a recorded result. This is a teaching matrix, not KiboCUBE’s current acceptance specification.
For example, a mass requirement can be checked by weighing the assembled article, while an electrical connection requires examination and appropriate testing of the defined interface. A successful mass measurement does not prove a compatible connector. The evidence must address the particular requirement.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep margins in their own dimensions
Suppose the fictional mass limit is 1,200 grams. The measured article is 1,050 grams and planned additions are 80 grams. The projected total is 1,130 grams, leaving 70 grams of margin. That calculation addresses only mass and assumes the additions are complete and accurately estimated.
Now suppose a separate mechanical check finds a protrusion outside the allowed envelope. The available mass margin cannot cancel that dimensional problem. Constraints in different units need separate dispositions, and every required constraint must be satisfied under the stated teaching rule.
A fictional readiness matrix
Original exercise; these numbers are not KiboCUBE interface requirements.
Open full-size diagram in a new tab: A fictional readiness matrixCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Tie evidence to the tested configuration
Imagine the electrical test passed before a connector was changed. The old result remains a useful historical record, but it does not establish compatibility of the revised connection. Identify which requirements the change affects and obtain the evidence those requirements now need.
A readiness review should show passed, failed and untested items explicitly. Unknown is not the same as failed, but neither is equivalent to passed. This makes remaining work actionable without converting a partial test set into a complete acceptance claim.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: UNOOSA: KiboCUBE program and awardeesProgram-provider account reviewed 3 November 2026: institutional roles, awardee rounds and deployment news. Selection and completed deployment are distinct milestones; this is not application or eligibility advice.
- Read: Technical University of Moldova: engineering and experiment purposesUniversity account dated 18 February 2022 describes participating disciplines, development and intended sensors, communications and power experiments. Its future transport and release stages are plans at publication.