Lesson 3 of 4 · Sequencing and undervoltage boundaries
Sequence startup and test the boundary
18 minute lesson · 3 checks along the way
Your goal for this lessonCompare startup orders and compute exact minimum-voltage and reset-dwell boundaries.
In this lesson 3 sections · 3 checks
Read & understand
Order changes the worst combination
Start A at zero and delay B until 2 milliseconds, exactly when A settles. Before B starts, total current is 1.5 A. During B’s startup, total current becomes 0.4 + 0.3 + 1.3 = 2 A, giving a minimum bus voltage of 4.5 V. This sequence just meets the voltage requirement; it has no spare voltage margin at the lowest point.
Reverse the order: start B at zero and A at 3 milliseconds. B’s startup alone draws 1.7 A including the platform. When A starts after B settles, the total reaches 0.4 + 0.4 + 1.1 = 1.9 A. The minimum voltage is now 4.525 V. Both orders avoid overlapping startup peaks, yet they have different minima because the already-running payloads draw different currents.
Startup order changes the margin
Original fictional prescribed-current traces. Time intervals include their start and exclude their end. The voltage axis is zoomed, not zero-based; all three plots use identical scales. Amber line marks the inclusive minimum voltage.
Open full-size diagram in a new tab: Startup order changes the marginRead diagram data as a table
| Sequence | From (ms) | Until (ms) | Voltage (V, exact) |
|---|---|---|---|
| simultaneous | 0 | 2 | 43/10 |
| simultaneous | 2 | 3 | 9/2 |
| simultaneous | 3 | 8 | 189/40 |
| A then B | 0 | 2 | 37/8 |
| A then B | 2 | 5 | 9/2 |
| A then B | 5 | 8 | 189/40 |
| B then A | 0 | 3 | 183/40 |
| B then A | 3 | 5 | 181/40 |
| B then A | 5 | 8 | 189/40 |
Original fictional prescribed-current traces. Time intervals include their start and exclude their end. The voltage axis is zoomed, not zero-based; all three plots use identical scales. Amber line marks the inclusive minimum voltage.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
A reset rule is a separate requirement
Add a fictional reset criterion: voltage below 4.5 V continuously for at least 1 millisecond triggers the criterion. Equality at 4.5 V is acceptable; equality at the one-millisecond dwell is enough to trigger. Simultaneous startup meets the reset criterion at time 1. If A starts at zero and B at 1.5, their startup peaks overlap for only 0.5 milliseconds. The voltage requirement is violated, but this reset criterion is not met.
If B instead starts at 1, the overlap lasts exactly 1 millisecond, and the criterion is met at time 2. We evaluate the prospective current trace without changing it after a trigger; the model does not simulate shutdown or reboot. Consequently, “no reset criterion met” is not the same as “interface requirement passed,” and a predicted trigger does not tell us what a real controller would do afterward.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Find a boundary, then test beyond it
For a 5 V source and a 4.5 V minimum, the available shared drop is 0.5 V. With A followed by B, the peak total is 2 A, so resistance must be no greater than 0.5/2 = 0.25 ohm. With B followed by A, the 1.9 A peak permits resistance up to 0.5/1.9 = 5/19 ohm, approximately 0.26316 ohm. The ordering choice changes the allowed boundary.
Raise resistance to 0.3 ohm while retaining A at zero and B at 2. The minimum becomes 4.4 V for B’s three-millisecond startup, so it violates the voltage requirement and meets the reset criterion. Raising the model’s source to 5.2 V restores a minimum of 4.6 V for that case. This is a sensitivity calculation, not permission to increase flight voltage: actual hardware has maximum-voltage and other constraints absent from the model.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA-hosted 2017 draft: hosted-payload interface comparisonMarch 23, 2017 DRAFT hosted-payload guidance, sections 2.2.3–2.2.4: startup currents, undervoltage response and fault propagation require interface consideration. General comparison only; its 28V numerical limits are not KNACKSAT requirements or current certification standards.
- Read: INSTED: KNACKSAT-2 shared platformPrimary institute account of 3U shared platform and partners; distinguishes up to five flight payloads from ten-slot research roadmap. Its scheduled-deployment language is superseded by JAXA post-event record.