Lesson 3 of 3 · Plans, results and project identity
Read a changing program portfolio
12 minute lesson · 3 checks along the way
Your goal for this lessonReconcile dated program records without confusing a cancelled project, an ongoing study and a completed demonstration.
In this lesson 4 sections · 3 checks
Read & understand
Attach every statement to the right project
LEAP supports a range of science and technology activities. That makes it possible for one project to end while another continues and a third reports a successful demonstration. A program-level summary should preserve those different outcomes. Start with the project identity, the claim, its date and the evidence type. Similar names or a shared lunar destination are not enough to treat several records as one continuous mission.
The CSA’s 2026–27 Departmental Plan states that work on the LEAP Lunar Rover Mission is to be terminated. The same plan continues development of a lunar CubeSat and describes separate lunar utility-rover studies. These statements can coexist. They do not show that the small rover flew, that every LEAP activity ended, or that a new utility-rover study is the same cancelled rover under another label.
Read & understand
Read plans and reports for different purposes
A departmental plan records intended future work at its publication date. A results report records reported accomplishments for a completed reporting period. The CSA’s 2024–25 results report describes LEAP-supported demonstrations on Blue Ghost Mission 1, including imaging, navigation and a material sample for dust-adherence investigation. It separately describes development progress on a rover. The later termination statement changes what should be said about that rover’s future, without erasing the earlier development work.
Consider a fictional project ledger with four rows: A has a completed ground prototype; B has a reported flight demonstration; C has a funded concept study; D has been cancelled before flight. If the question is how many rows have reported flight demonstrations, the answer is one of four. Adding the prototype and the study would change the meaning of the count. Calling the cancelled row a failure of every technology would also claim more than this ledger establishes.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Count claims without counting the same result twice
Suppose project B appears in three documents: a launch announcement, a demonstration report and a later annual summary. Those are three sources for one project, not three flight demonstrations. Deduplicate by the underlying project and event before counting. Conversely, two contributions aboard one lander can have separate objectives and results. Shared transport does not merge their science questions, just as separate press releases do not create extra missions.
A portfolio count needs a stated unit: supported organizations, distinct projects, payloads, launches or demonstrated capabilities. In the fictional ledger, one of four projects has flight-demonstration evidence, or 25 percent. That fraction describes the defined ledger only. It is not a reliability estimate, a comparison of project value or a score for the real LEAP program. A small prototype might answer an important question despite remaining at a different stage.
Count evidence stages without merging projects
Original fictional portfolio. Real LEAP records separately document Blue Ghost contributions, the small rover’s termination and continuing development activities.
Open full-size diagram in a new tab: Count evidence stages without merging projectsCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Preserve what remains useful after a change
A cancelled mission can leave designs, test evidence, scientific preparation and trained teams. Reuse depends on whether those outputs fit a later project’s requirements and configuration. Preserve the original provenance, including the conditions and limitations of a test. It is reasonable to investigate possible reuse; it is not reasonable to label a study as an accomplished flight because its predecessor produced valuable work.
Finish a program account with separate sentences for demonstrated results, ongoing development and ended work, each tied to a dated source. Revisit future-facing claims when newer records appear. For LEAP, this approach recognizes documented Blue Ghost contributions, accurately records the small rover’s termination and leaves later concepts at their demonstrated stage. A changing portfolio becomes understandable when the reader can follow each identity and evidence claim through time, without forcing every project into one success-or-failure label.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: CSA: 2024–25 Departmental Results ReportReports LEAP-supported imaging, navigation and dust-adherence demonstrations on Blue Ghost Mission 1. The report is distinct from future plans.
- Read: CSA: 2026–27 Departmental PlanSeparates termination of the LEAP Lunar Rover Mission from continuing lunar CubeSat development and utility-rover studies.
- Read: CSA: LEAP capability demonstration opportunity, 2020–2022Historical objectives connect payload development with delivery, integration and demonstration. Closed application dates are not current guidance.