Lesson 1 of 3 · Event identity, signed impulses and cumulative navigation errors
Audit small-force impulses across an interface
14 minute lesson · 3 checks along the way
Your goal for this lessonNormalize a signed impulse ledger, retain event times and use an independent comparison to test a navigation interface.
In this lesson 4 sections · 3 checks
Read & understand
Define the physical event before summing records
Mars Surveyor was a 1990s program of repeated Mars investigations, with Mars Global Surveyor followed by the Surveyor 98 orbiter and lander. Mars Climate Orbiter was lost in September 1999. NASA’s investigation found that ground-generated thruster information used pound-force seconds where navigation software expected newton-seconds. The onboard calculation used the intended units. The report also identified attitude-file problems and inadequate interface verification: remembering a conversion factor does not capture the entire engineering lesson.
Build an original fictional ledger in one specified inertial x direction. Event E1 supplies 0.4 pound-force seconds along +x at time zero; E2 supplies 0.3 along +x at 1,000 seconds; E3 supplies 0.2 along −x at 2,000 seconds. A retransmitted E2 record carries the same immutable event identifier and adds no firing. The supplied directions already include the spacecraft attitude transformation. An actual body-axis value would need that transformation before joining this common-frame sum.
Read & understand
Carry time through the accumulation
Use the declared rounded conversion 1 pound-force = 4.44822 newtons and a constant mass of 500 kilograms. The unique signed impulse is Jx = (0.4 + 0.3 − 0.2) × 4.44822 = 2.22411 newton-seconds. Its final velocity contribution is Jx/m = 0.00444822 metres per second. Summing unsigned magnitudes would lose the opposing direction of E3; counting the retransmission would invent an additional E2. Unit conversion alone fixes neither mistake.
Now stipulate force-free perturbation motion until T = 10,000 seconds, with zero initial position and velocity perturbations. Each impulse contributes its velocity change for the remaining interval, so δx(T) = Σ[Jx,i(T − ti)]/m. The result is 4.44822 × (0.4 × 10000 + 0.3 × 9000 − 0.2 × 8000)/500 = 45.371844 metres. Applying the final net velocity change over the entire interval instead gives 44.4822 metres. That shortcut wrongly places all events at the initial time.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Compare an independently generated quantity
For E1 alone, suppose a separately generated estimate reports 1.779288 newton-seconds. A faulty consumer reads the producer’s 0.4 pound-force seconds as 0.4 newton-seconds. Their absolute disagreement is 1.379288 newton-seconds. A fictional acceptance threshold of 0.05 newton-seconds therefore flags the event. The comparison must be genuinely independent: two programs sharing the same mistaken conversion can agree perfectly while both represent the physical firing incorrectly.
A useful audit retains the source value and unit, converted value, direction convention, event time and identity. It also records what resolved a disagreement. NASA’s report discussed insufficient end-to-end testing and opportunities to compare independent estimates. Our duplicate-message example extends that interface reasoning without asserting a duplicate caused the real accident. Correct one failure, then check the other requirements separately; passing a scalar impulse test cannot establish that every attitude or time tag is correct.
An impulse needs identity, direction and time
A shared frame and distinct event IDs establish what to sum. Individual event times determine how long each velocity contribution acts in this explicitly simplified drift model.
Open full-size diagram in a new tab: An impulse needs identity, direction and timeCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Keep the model and the program history distinct
The 45.37-metre result is not a reconstruction of Climate Orbiter’s trajectory. This fictional model omits Mars gravity, orbital propagation, changing mass and the fitting of tracking observations. Real navigation depends on geometry and the observations available, as well as spacecraft forces. Its value here is exposing how signed, individually timed contributions accumulate and why a final total cannot substitute for an auditable sequence.
Program documents require equally careful interpretation. A 1997 release described planned Surveyor 2001 orbiter and lander investigations; a May 2000 release already called the lander canceled. The orbiter proceeded as Odyssey, which launched in April 2001 and reached Mars that October. Planned instruments, proposed maneuvers and later hardware reuse need their own dated evidence. Neither a canceled lander nor an unflown early configuration becomes a successful mission merely because part of the program continued.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA: Mars Climate Orbiter Phase I investigationRead printed pages 16–18 and 21–24 for interface units, attitude information, independent comparisons and verification. The numerical ledger here is invented.
- Read: JPL: the original Surveyor 2001 planThe November 1997 selection describes plans; its aerocapture and rover details are not a record of the eventual flown configuration.
- Read: JPL: revised Mars mission options in May 2000The dated article explicitly refers to the canceled 2001 lander. Proposed 2003 options are still proposals here.
- Read: JPL Science: Odyssey flight chronologyRecords the April 7, 2001 launch and October 24 arrival; no current operational status is inferred.