Read & understand
Count readings on a declared time grid
Mars Polar Lander and the accompanying Deep Space 2 probes were lost on arrival in December 1999. The JPL review identified premature engine shutdown following a spurious touchdown indication as the most probable lander failure mechanism. Ground deployment tests supported that mechanism, but no descent telemetry recorded the actual sequence. This lesson examines the logic of sampled evidence; it does not present a complete replica of the lander’s flight software.
Use an original detector sampling at 50 hertz, or every 20 milliseconds: 0, 20, 40, 60 and so on. It qualifies an event after two consecutive high reads. A pulse high on [11,49) milliseconds includes the 20 and 40 millisecond samples and qualifies at 40. The bracket notation includes the starting instant and excludes the ending instant. A pulse on [21,59) has the same 38-millisecond duration but includes only the 40-millisecond sample, so it does not qualify.
Read & understand
Separate retained state from permission to act
The sample pattern depends on phase as well as pulse width. Furthermore, high readings at 20 and 40 milliseconds establish the input only at those instants. They do not prove that it stayed continuously high in between. A digital monitor can enforce a consecutive-read rule while a learner must still distinguish that rule from an uninterrupted physical contact lasting a known duration. Unobserved changes require additional bandwidth assumptions or measurements.
Now define a deliberately flawed teaching monitor. The two high reads set a stored flag at 40 milliseconds; that flag never resets. The input falls low after 49 milliseconds, but a separate command gate opens at 200 milliseconds and acts whenever the stored flag is true. The monitor therefore commands shutdown at 200 milliseconds despite the current low input. Delaying permission to act has not prevented earlier data from creating actionable state. The sequence is fully determined by these stated fictional rules.
Mars Polar Lander during ground preparation at Kennedy Space Center on October 29, 1998, in NASA photograph KSC-98PC-1610. This complete frame documents spacecraft hardware before launch; it does not show a touchdown or establish the cause of the later loss.
Look closely
Does the appearance of completed hardware establish how its touchdown logic behaved at Mars?
See what to notice
No. The photograph records ground preparation. Software tests and investigation reports provide separate evidence, and the actual descent was not recovered as a complete telemetry record.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Exercise the transition as well as steady operation
Compare a second, limited teaching rule: while the gate is closed, discard the counter and flag; after enabling, reset the counter on every low read and qualify only after two consecutive high reads. Enable at 200 milliseconds. If genuine contact begins at 211 milliseconds and remains high, the first high sample is at 220 and the second at 240. With processing delay stipulated as zero, qualification occurs 29 milliseconds after contact.
The latency is determined by the sample grid rather than a timer started at the unknown contact instant. In this ideal two-read case, phase can move the response from 20 milliseconds to just under 40 milliseconds after onset. Testing should vary the transient’s phase, duration and position relative to enabling, and include low-read resets and valid late contact. This small comparison does not handle every sensor failure, scheduling delay or redundant voting case, and is not certified spacecraft control logic.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Use ground evidence without inventing a flight record
NASA’s lessons-learned record explains that a full deployment test was not repeated after a wiring correction; a manual sensor check did not exercise the same transient behavior. Its April 2017 update retained the earlier conclusions while noting additional entry, descent and landing failure modes found during Phoenix development. Reproducing and correcting one hazardous path is valuable even when the exact historical failure remains uncertain. It cannot show that every other path was absent.
Deep Space 2 remained a separate New Millennium technology mission that rode with the lander. Its loss must not be assigned the lander’s touchdown mechanism merely because the missions traveled together. Phoenix was separately selected under Mars Scout and landed in May 2008 using modified hardware from the canceled Surveyor 2001 lander. Inherited components preserve experience, but changed software, environments and validation also matter. A successor’s successful landing neither erases the earlier uncertainty nor identifies its cause uniquely.
Sampling, stored state and action are separate
A pulse’s position relative to the sample grid matters. Delaying an output gate and discarding earlier sensor history are different operations; both must be specified in any model.
Open full-size diagram in a new tab: Sampling, stored state and action are separateCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: JPL: Mars Polar Lander and Deep Space 2 reviewThe first report part includes the executive summary, the missing-telemetry assessment on printed page 15, and the probable shutdown mechanism on page 26.
- Read: NASA: lessons learned, including the 2017 updateRead the driving event and April 18, 2017 update. The title’s 1998 label does not change the December 1999 date of the actual loss.
- Read: JPL: Deep Space 2 historical mission recordThe archived outcome notice identifies New Millennium affiliation and the probes’ failure to respond; it is not a maintained current-status page.