Lesson 2 of 4 · Aligned outage histories
Compare outage timelines
18 minute lesson · 3 checks along the way
Your goal for this lessonCompute simultaneous outages from two time histories and explain why separate downtime totals cannot determine backup performance.
In this lesson 3 sections · 3 checks
Read & understand
Read both paths against the same clock
Observe a fictional service for 120 minutes. Path A is unavailable from minute 10 to 40 and from 80 to 100. Path B is unavailable from 25 to 55 and from 90 to 110. Use half-open intervals: an outage includes its start and ends just before its stated endpoint. This convention avoids counting a boundary twice and lets adjacent intervals meet without creating an extra instant of failure.
Path A has 30+20=50 unavailable minutes. Path B also has 30+20=50. These equal totals do not mean the failures happened together. Under an ideal selector that can use either working path immediately, service is unavailable only where both paths are unavailable. We must compare the time histories, not add their downtime totals or multiply percentages without an independence assumption.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Find the overlaps that defeat both routes
The first overlap runs from minute 25, when B fails, until minute 40, when A recovers: 15 minutes. The second is from 90 to 100: 10 minutes. The other intervals do not overlap. Both paths are therefore unavailable for 25 minutes in total. Ideal usable time is 120−25=95 minutes, or 95/120=19/24, about 79.17 percent of this window.
Compare this with a requirement that both paths work at the same time. That different requirement would fail whenever either path is unavailable. The union of the outage histories lasts 50+50−25=75 minutes, leaving 45 minutes when both work. Which calculation is correct depends on the service rule: either path sufficient, or both required. Drawing the requirement before calculating avoids giving a precise answer to the wrong question.
Find when both routes fail
Original hypothetical model. Colored segments mark outages on a common minutes scale; intervals include their start and exclude their end. Either working route suffices, with ideal instantaneous switching.
Open full-size diagram in a new tab: Find when both routes failRead diagram data as a table
| Record | Outage intervals (minutes) | Total unavailable minutes |
|---|---|---|
| Path A | [10,40), [80,100) | 50 |
| Path B | [25,55), [90,110) | 50 |
| Both paths | [25,40), [90,100) | 25 |
Original hypothetical model. Colored segments mark outages on a common minutes scale; intervals include their start and exclude their end. Either working route suffices, with ideal instantaneous switching.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Separate measured overlap from assumed independence
If all we knew were two 50-minute outage totals in a 120-minute window, the overlap could be anywhere from zero to 50 minutes. The lower bound is the larger of zero and 50+50−120; the upper bound is the smaller individual total. With ideal selection, those bounds permit between 70 and 120 usable minutes. The actual aligned histories narrow that range to 95. Marginal totals alone cannot supply the missing timing information.
ITU-R P.618 discusses site diversity in terms of joint propagation impairments: conditions at different paths must be considered together. That physical context motivates our question, but the interval arithmetic here is an original measured-history exercise, not the ITU prediction method. A short observation window does not establish annual reliability, and two physically separate paths do not by themselves establish statistically independent failures.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.