Lesson 3 of 4 · Shared dependencies and switching
Include shared dependencies and switching
18 minute lesson · 3 checks along the way
Your goal for this lessonCombine joint path failure with shared-terminal and switching intervals without double-counting overlaps.
In this lesson 3 sections · 3 checks
Read & understand
A shared terminal can defeat either path
Retain the two-path history and add a shared terminal that is unavailable from minute 30 to 45. The service now fails if both routes fail, or if the terminal fails. The terminal’s 15-minute outage overlaps ten minutes of the earlier joint path outage, from 30 to 40. Adding 25+15 would count those ten minutes twice.
The combined failure intervals are 25 to 45 and 90 to 100. Their lengths are 20 and 10, so total service downtime is 30 minutes. Equivalently, 25+15−10=30. Usable time is 90/120, or 75 percent. Adding a backup route did not eliminate a terminal shared by both routes. Power, an access device or a required local application can create the same logical dependency, although actual causes require evidence.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Account for switching rather than assuming it away
Now suppose the service log also records interruptions from minute 10 to 12 and from 80 to 82 while the system changes paths. These four minutes do not overlap the 30 minutes already counted. The union therefore contains 34 unavailable minutes, leaving 86/120=43/60, about 71.67 percent usable time. We are adding explicitly observed interruption intervals, not deriving them from a real SATRIA controller.
A slower change of path can consume some of the benefit of redundancy even while the alternate path itself is healthy. Conversely, an interruption already inside a joint outage must not be counted again. Treat switching, shared equipment and path failures as intervals on one time axis; combine them under the stated service logic. The resulting total should describe end-to-end unavailable time, not a sum of incident durations that overlap.
Count each unavailable minute once
Original hypothetical model. A shared terminal outage defeats either route. All colored bars mark unavailable intervals on the same scale; the bottom bar is their union, not their summed durations.
Open full-size diagram in a new tab: Count each unavailable minute onceRead diagram data as a table
| Failure contribution | Intervals (minutes) | Additional service downtime |
|---|---|---|
| Both routes | [25,40), [90,100) | 25 minutes |
| Shared terminal | [30,45) | 5 minutes after overlap |
| Switching | [10,12), [80,82) | 4 minutes |
| Combined service | [10,12), [25,45), [80,82), [90,100) | 34 minutes total |
Original hypothetical model. A shared terminal outage defeats either route. All colored bars mark unavailable intervals on the same scale; the bottom bar is their union, not their summed durations.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Test a proposed improvement against the complete history
In this example, removing switching interruptions restores usable time to 90 minutes. Removing only the terminal outage while retaining switching leaves 25+4=29 unavailable minutes, or 91 usable minutes. Removing both effects reaches the ideal two-path result of 95 usable minutes. These differences follow from the particular overlaps; they do not rank terminal work and switching work universally.
A real improvement proposal must identify which dependency it changes and which other requirements remain. The alternate route must still carry the needed traffic, the endpoint must remain powered, and the monitoring must observe the intended application. An engineering model can compare interventions under its assumptions, while the operational claim still needs a test after the change. Keep the before-and-after window and service definition visible.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: Komdigi: emergency SATRIA access deployment, November 2025Equipment mobilization and proposed emergency installation sites. The notice targets subsequent operation; do not report all ten sites as already active.
- Read: ITU-R P.618-14: Earth-space propagation, sections 2.2.4–2.2.4.1Physical context for site diversity and jointly impaired paths. The course uses original empirical interval accounting, not the ITU prediction equations or a reconstruction of SATRIA gateway configuration.