Lesson 6 of 6 · Distinguishing proposed and demonstrated capabilities
Separate a proposal from a demonstrated capability
8 minute lesson · 3 checks along the way
Your goal for this lessonRead mission status with dates, conditions and precise verbs.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Words with a dotted underline open a short definition right here in the lesson.
Read & understand
A development story contains different kinds of evidence
A concept describes an intended approach. A funded project has resources and responsibilities but still faces technical work. A ground test supplies evidence under specified conditions; a flight test adds a particular flight environment. Operational service requires sustained performance beyond a single demonstration.
These stages do not form a magic ladder that every project climbs on schedule. Designs change, tests reveal problems and projects can be stopped. NASA’s technology-readiness framework helps describe maturity, but readiness must be attached to a specific technology and intended environment.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Read the claim at its actual scope
“Reached orbit,” “landed a booster,” “returned a sample” and “operated for a year” establish different achievements. A system can succeed at one objective while missing another. The useful question is what the evidence demonstrates, not whether an entire mission can be reduced to a single celebratory or dismissive word.
Compare the publication date with the event date. A prelaunch article describes expectations, even when its headline remains online after launch. A later report can update the outcome without making the earlier forecast a false account of what planners intended at that time.
Mobile Launcher 1 rides on crawler-transporter 2 at Kennedy Space Center. Ground infrastructure is part of a launch system’s capability. The visible platform does not by itself establish that a particular rocket, spacecraft and operating team have completed integrated flight readiness.
Look closely
What would support a claim of integrated readiness beyond the existence of this hardware?
See what to notice
Configuration-specific inspections, tests and operational reviews would connect the ground system with the vehicle and procedures. A hardware photograph alone does not establish that complete state.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Practice with an evidence ladder
In a fictional project, a pump runs for ten hours in a laboratory vacuum chamber. That is stronger evidence than a drawing, but it does not by itself establish years of radiation exposure, launch vibration survival or reliable integrated operation. The test conditions define its evidential boundary.
Build a short record with the claim, supporting source, event date, tested conditions and remaining uncertainty. Separate hardware readiness, mission approval, launch outcome and scientific interpretation. This habit makes a modern-space history useful as events change, and helps readers update one claim without rewriting the entire course around a prediction.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: NASA: technology readiness levelsCompare the explanation and its assumptions with the worked example in this lesson.
- Read: NASA: product realizationCompare the explanation and its assumptions with the worked example in this lesson.
- Read: NASA: Artemis I splashdown, December 11, 2022Compare the explanation and its assumptions with the worked example in this lesson.