Lesson 1 of 3 · Reference points, orientation and bounded geometry
Locate the docking port from relative pose
14 minute lesson · 3 checks along the way
Your goal for this lessonTransform a measured reference point into docking-port position and propagate explicit position and angle bounds.
In this lesson 4 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A completed demonstration, with separate results
SpaDeX, the Space Docking Experiment, used two Indian spacecraft launched on December 30, 2024. The archive records SPADEX-A and SPADEX-B separately. ISRO reported their first docking on January 16, 2025, undocking on March 13, and a second docking followed by power-transfer tests in April. Each result concerns a different operation: reaching a controlled encounter, making a connection, releasing it or using an interface. One photograph or one successful event cannot establish all of those capabilities.
The mission has ended. ISRO’s October 23, 2026 report states that both spacecraft reentered on October 12 after fuel exhaustion and orbital decay. That outcome is distinct from a deliberately controlled deorbit. The final report also records composite control, payload operations and circumnavigation. These achieved results support further engineering study, but they do not establish qualification for every future spacecraft, crewed vehicle or operating environment. This lesson examines one geometry problem using original fictional values, not SpaDeX flight tolerances.
The two SpaDeX spacecraft stand on adjacent test supports in an ISRO prelaunch photograph. This is ground hardware context, not a photograph of docking in orbit. The source does not identify the left and right spacecraft individually. Photograph: Department of Space / Indian Space Research Organisation. Complete source photograph preserved.
Look closely
What does this prelaunch pair photograph establish?
See what to notice
It shows the two identified SpaDeX spacecraft during ground preparation, without assigning their left/right identities. Docking performance and flight outcomes require separate dated evidence.
Read & understand
Measure the point that must actually meet its counterpart
Define a flat, target-fixed coordinate system. The target docking port is at lateral coordinate y = 0. A measured reference point on the approaching spacecraft has coordinate yRef. Its docking port lies a distance L forward along the spacecraft’s own axis. Positive yaw θ rotates that forward direction toward positive y. Under these explicit two-dimensional assumptions, the port coordinate is yPort = yRef + L sin θ. Translation and orientation both affect the point that must meet the target.
For the fictional values yRef = 0.025 metres, L = 0.8 metres and θ = +3 degrees, the rotational contribution is 0.041868765 metres. Adding the reference-point offset gives yPort = 0.066868765 metres, about 66.9 millimetres. The reference point is only 25 millimetres from the target axis, but the port is farther away. If an invented lateral acceptance band is ±0.05 metres, judging the reference point alone would give the wrong conclusion about port position. This band is a classroom assumption, not an operating command.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Carry the allowed measurement range through the transformation
Suppose the reference coordinate is allowed to vary independently by ±0.008 metres and yaw by ±0.5 degrees, while L is treated as exact. The resulting input intervals are yRef from 0.017 to 0.033 metres and θ from 2.5 to 3.5 degrees. Sine increases throughout this angle interval. Consequently the minimum port coordinate uses both lower endpoints, and the maximum uses both upper endpoints. The port interval is approximately [0.051895510, 0.081838832] metres.
Every allowed combination in this model places the port beyond the positive 0.05-metre boundary. These are deterministic bounds: no probability distribution, confidence percentage or typical error has been specified. A nominal value inside a band would not be enough if its allowed interval crossed the boundary. Conversely, an interval wholly inside the lateral band would establish only this particular geometric condition under the assumptions. It would not prove acceptable closing speed, full three-dimensional alignment or mechanical readiness.
The port inherits both position and yaw
Original planar pose-to-port transformation with a uniformly scaled upper geometric sketch and an enlarged lateral interval chart. The arbitrary acceptance band and independent bounds are teaching inputs, not SpaDeX limits.
Open full-size diagram in a new tab: The port inherits both position and yawCheck 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Preserve the signs, frame and limits of the inference
Changing yaw to −3 degrees while retaining yRef = 0.025 metres reverses the lever-arm contribution. The nominal port coordinate becomes −0.016868765 metres. Replacing sin θ with its absolute value would erase that directional information. An angle measured in the spacecraft frame, a coordinate measured at another reference point or a reversed lateral axis requires a corresponding transformation. A number without its frame, point and sign convention is incomplete navigation evidence.
Real rendezvous and docking involve relative velocity, rotations about three axes, sensor biases, structural flexibility and time delays. A camera can also measure a feature whose location differs from the mechanical contact plane. The small calculation explains why the engineering chain must connect sensed features to the physical interface. SpaDeX demonstrated a working encounter system under its own conditions; this exercise teaches how to inspect one geometric claim without turning a simplified sketch into a flight procedure.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: SpaDeX MissionPrelaunch architecture and test approach. The old future-tense wording and postponement banner are not current status; the course uses the later outcome reports.
- Read: ISRO successfully completed docking of two SPADEX satellites (SDX-01 & SDX-02) in the early hours of 16 January, 2025Dated confirmation of the January 16, 2025 first docking. The brief report does not supply flight contact-force or navigation-error histories.
- Read: SPADEX Satellites Re-entry into Earth’s Atmosphere on October 12, 2026October 23, 2026 final report: both spacecraft reentered October 12 after fuel exhaustion and orbital decay. This is not described as controlled deorbit.