Lesson 1 of 4 · University mission milestones
Separate the mission milestones
12 minute lesson · 3 checks along the way
Your goal for this lessonDistinguish a student satellite’s development, transport, deployment and demonstrated operation.
In this lesson 3 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
A university project with international access
Surya Satellite-1, or SS-1, is a Surya University one-unit CubeSat, catalogued in the archive as SuryaSat. JAXA lists amateur-radio and Automatic Packet Reporting System demonstrations, together with Indonesian space-technology capacity building, among its objectives. KiboCUBE, the JAXA and United Nations Office for Outer Space Affairs cooperation, provided the deployment opportunity. The spacecraft and the access programme have distinct identities.
The engineering story therefore includes both a university team and shared infrastructure. A useful account gives credit for each contribution without treating access to a launch and deployer as proof that Indonesia demonstrated its own orbital launch vehicle.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Read the sequence before judging success
JAXA records selection in September 2018, handover in July 2022, transport to the International Space Station in November 2022, and release from Kibo on January 6, 2023. Its January 11 release also reports university operation after deployment. These are different milestones supported by a dated account.
That early-operation report does not establish present-day availability or completion of every communications objective. A photograph of separation documents a different question from a received message, and neither alone measures the skills retained by the team. State which outcome the evidence supports.
Comparison: NASA photographed a NanoRacks deployment group including CXBN-2 in May 2017. This is not SS-1 or its 2023 JAXA deployment equipment. The full frame illustrates separation; it does not identify which small object is CXBN-2 or demonstrate payload operation.
Look closely
What does visible separation establish, and what remains to be checked?
See what to notice
The image shows a different 2017 deployment group separating from station hardware. It does not establish SS-1 identity or payload operation; those require their own dated evidence.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Ask a question a model can answer
The rest of this course asks an original engineering question: can a planned sequence of electrical tasks be supplied throughout a short observation window? We use invented powers, times and storage values. They are not SS-1 specifications, reconstructed telemetry, or a claim about its actual operating plan.
Imagine two student teams reporting that their schedules generate more energy than they request. One schedule still runs out early. To explain how both statements can be true, we must track when energy arrives, when it is requested, and how much can be stored. A real mission motivates the exercise; a deliberately simple model lets us inspect the reasoning.
Check 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: JAXA: three CubeSats deployed from KiboJanuary 2023 report identifies SS-1, its developer, deployment and stated communications objectives.
- Read: JAXA: Surya Satellite-1 deployment and milestonesJanuary 11, 2023 release separates selection, handover, transport, deployment and early university operation.