Lesson 1 of 3 · Instrument loading and cell-terminal measurements
Account for the measuring circuit
23 minute lesson · 3 checks along the way
Your goal for this lessonCalculate how finite meter resistance and current-lead losses change a reading, and identify the voltage measured by four-wire sensing.
In this lesson 4 sections · 3 checks
Using archive links & definitions
Follow a linked name to explore its archive card. “Back to your lesson” brings you to the same part of the reading.
Read & understand
Start with the quantities actually measured
Zeus-1 launched on January 3, 2023 with an Airbus experiment using CEA perovskite solar cells. CEA’s May account describes one device measuring open-circuit voltage and a second measuring short-circuit current, with ground samples intended for comparison. That is a particular measurement design, not a published history of maximum power. The launch release and early account establish an experiment and its intended investigation; they do not provide a completed long-term performance data set.
Open-circuit voltage, written Voc, refers to zero external current. Short-circuit current, Isc, refers to zero voltage across the cell terminals. Their product is not a simultaneous operating point: one endpoint has zero current and the other has zero voltage. Combining readings from two different devices adds a device-matching assumption. A power curve requires corresponding voltage and current from the same operating state. The retained survey explains the hosted mission; here we examine how even an endpoint reading can be disturbed by its circuit.
The OAST-1 Solar Array experiment is deployed during STS-41D. This earlier flight test provides historical context; it is not Zeus-1 or its perovskite hardware. Electrical performance requires measurements beyond what the deployed structure shows.
Look closely
What does this photograph show, and what cannot it establish about Zeus-1?
See what to notice
The complete NASA / MSFC frame shows the earlier OAST-1 array deployed during STS-41D. Its owner remains the OAST-1 vehicle record. It is historical context, not Zeus-1 hardware, wiring or a measurement of perovskite performance.
Read & understand
A voltmeter draws a finite current
Use an intentionally linear teaching cell whose delivered current is I=0.030−0.010V amperes, with V in volts between zero and three. Thus its ideal endpoints are 30 mA and 3 V. Its real-world counterpart would have a more complicated curve; the 100-ohm reciprocal slope here is a property of this toy curve, not a measured internal series resistance or a Zeus-1 parameter. Current delivered to an external load is positive throughout this course.
Connect a voltmeter whose input behaves as a 9,900-ohm resistance across the cell. Its current is V/9,900 amperes. Equating that current to the cell’s output gives 0.030−0.010V=V/9,900, so the reading is 2.97 V. The meter draws 0.30 mA and reads one percent below the ideal 3 V. With only 900 ohms across the same cell, the reading becomes 2.70 V, ten percent low. A high input resistance reduces this loading; the desired accuracy depends on both the instrument and the measured source.
Check 1 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
An ammeter can prevent a true short circuit
Model the ammeter and its connections as a total ten-ohm external resistance. The cell now supplies I=3/(100+10)=0.02727 A, or about 27.27 mA. Its terminal voltage is I×10≈0.273 V, so it is not at the ideal short-circuit point. Relative to 30 mA, the current is about 9.09 percent low. Merely labeling a channel Isc does not make the terminal voltage zero.
This resistance model illustrates voltage burden, the nonzero voltage required across a current-measuring path. Real burden can depend on instrument range and circuitry. An electronic load or source-measure unit can control an operating voltage and read current, but its limits, calibration and settling still matter. The Keithley application note uses negative current when the instrument sinks power from the cell; that sign convention differs from our positive delivered current without changing the physical direction of energy flow.
Check 2 of 3
10 pointsUse the reading above. You can try again without losing points.
Read & understand
Sense voltage where it belongs
Suppose 20 mA travels through current leads with five ohms of total resistance. The leads drop 0.020×5=0.10 V. If a meter reads 1.90 V at the load, the cell terminals are at 2.00 V in this delivering-power example. Cell output is 40 mW, the load receives 38 mW, and the leads dissipate I²R=2 mW. These are three consistent locations in one energy balance.
Four-wire sensing uses one pair of leads to carry current and another, drawing negligible current in this model, to sense voltage close to the cell terminals. It removes the force-lead drop from that voltage measurement. It does not physically erase the two milliwatts dissipated in those leads. The historical OAST-1 photograph shows a deployed solar-array experiment during STS-41D; it is not Zeus-1. Neither its visible structure nor a wiring label establishes the accuracy of an electrical reading. Record the sensing location, sign convention, operating conditions and instrument configuration with the result.
Finite loads disturb endpoints; sense leads identify the cell voltage
Original measurement models. Blue voltage-sense connections are separate from the gold current path. Negligible sense current is assumed; four-wire sensing does not remove force-lead losses.
Open full-size diagram in a new tab: Finite loads disturb endpoints; sense leads identify the cell voltageCheck 3 of 3
10 pointsUse the reading above. You can try again without losing points.
Put it together
Your lesson progress
Each check connects to a part of the story. Complete all 3 to earn your 25-point lesson bonus.
Explore further · Optional
Go to the source
Explore the evidence behind this lesson. These optional readings and videos open in a new tab.
- Read: CEA: the Zeus-1 perovskite experimentMay 17, 2023 account. The two endpoint devices and planned ground comparison are distinguished from completed long-term results.
- Read: Qosmosys: Zeus-1 launch and hosted experimentsJanuary 2023 release. Its test campaign is prospective, and its other payloads have separate purposes.
- Read: Keithley: photovoltaic I–V measurementPrinted pages 2–4 and Figures 1–5 explain cell loading, current sign and four-wire connections. The linear cell and resistance values here are original teaching examples.